Similar Items: Owner time and cost contingency estimation for building construction projects in Egypt
- Towards the development of transition probability matrices in the Markovian model for the predicted service life of buildings
- A Proposal for the Use of Failure Mode and Effect Analysis as Risk Management Tool in Construction
- Control modelling of coupled shell and tube heat exchangers using combined neural network and fuzzy logic
- Autonomous flight control system for an airship
- An investigation into control techniques for cascaded plants with buffering, to minimise the influence of process disturbances and to maximise the process yield
- Enriching deontic logic with typicality