Similar Items: Optimization of Pile Construction Sequence Using CFA Machines
- An algorithm for job scheduling in 2 - machine flow shop problem
- Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
- Characterisation of model uncertainty for reliability-based design of pile foundations
- Model testing of rubble mound breakwater toe units on steep rocky sea beds
- The effect of the ratio of pile spacing to diameter (s/d) on behavior of tensile pile groups in dense sand
- Resource-constrained scheduling for construction projects