Similar Items: The Effect of Variation Orders on Project Cost and Schedule Overruns
- The estimation and management of cost over the life cycle of metallurgical research projects
- Rework Prediction on a Construction Site through BIM & ANN Integration
- The treatment of uncertainty in construction price modelling
- "Towards estimating the cost premium of Green Star certified office buildings in South Africa
- A development cost comparison between a multi-storey mass timber and reinforced concrete building in South Africa
- An evaluation of the available methods of selecting a contractor, in order to satisfy the client's objectives, with a view to offering a systematic approach to which method should be adopted
Author: Wium, Jan
- Developing a method for prioritising maintenance for reinforced concrete reservoirs
- Increasing the utilisation of hybrid concrete construction in South Africa
- Assessment of seismic drift of structural walls designed according to SANS 10160 - Part 4
- An investigation into the time and cost factors for a decision between in-situ and hybrid concrete construction
- Development of a multi-criteria assessment tool to choose between housing systems for the low cost housing market
- A decision model for the investment in technology to reduce concrete rework