Similar Items: The ROSIN Project and its Outreach to South Africa
- A Review of Robotics Research in South Africa
- The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
- Financing Renewable Energy in South Africa’s Wind Industry
- Novel Linear Piezo Actuator
- Slip Factor Prediction for Impellers with Straight, Back-swept Blades
- A Parametric Design and Optimization Approach to Enhance the Fatigue Life of a Male Pyramid Socket Adapter