Similar Items: Development of a Precast Column Solution Using Precast Prestressed Concrete Piles Filled with Cast-In-Place Concrete
- Drying Shrinkage of Cast-In-Situ Concrete in Half-Precast Concrete System Under Restraint Conditions
- Cyclic Behavior of Moment-Resisting Precast Concrete Beam–Column Connection Subjected to Mechanical Reinforced Couplers
- Experimental performance analysis of concrete-filled steel column to concrete-filled steel beam connections
- Numerical analysis and experimental testing of ultra-high performance fibre reinforced concrete keyed dry and epoxy joints in precast segmental bridge girders
- Shear buckling behavior of a plate composite girder using concrete-filled steel tube structures
- Precast modular construction of schools in South Africa