Similar Items: 4D schedule generation for flat slab BIM models
- An LLM Approach for Automating the Analysis of BIM (IFC) Data
- BIM-Based model for the automatic generation and optimization of planning and 4-D scheduling for concrete skeleton: A graph theory approach
- 5D Framework to Maximize Revit's Potential in BIM for Commercial Projects
- Parametric modeling of blockwall assemblies for automated generation of shopdrawings and detailed estimates using BIM
- A BIM-Based Flexible Flow Shop Framework for Scheduling Linear Infrastructure Projects
- Evaluation of building information modelling (BIM) adoption, capability and maturity within South African consulting and construction firms