(2011). A bi-criteria algorithm for the simultaneous minimization of makespan and number of tardy jobs on a single machine with sequence dependent set-up time.
Successfully copied to clipboard
Copying to clipboard failed
Chicago Style (17th ed.) Citation
A Bi-criteria Algorithm for the Simultaneous Minimization of Makespan and Number of Tardy Jobs on a Single Machine with Sequence Dependent Set-up Time. 2011.
Successfully copied to clipboard
Copying to clipboard failed
MLA (9th ed.) Citation
A Bi-criteria Algorithm for the Simultaneous Minimization of Makespan and Number of Tardy Jobs on a Single Machine with Sequence Dependent Set-up Time. 2011.
Successfully copied to clipboard
Copying to clipboard failed
Warning: These citations may not always be 100% accurate.