APA (7th ed.) Citation
Heyns, P. (2025). A methodology for risk-based management of the remaining life of structures in vertical mine shafts through integrated structural inspection and maintenance. University of Pretoria.
Chicago Style (17th ed.) Citation
Heyns, P.S. A Methodology for Risk-based Management of the Remaining Life of Structures in Vertical Mine Shafts Through Integrated Structural Inspection and Maintenance. University of Pretoria, 2025.
MLA (9th ed.) Citation
Heyns, P.S. A Methodology for Risk-based Management of the Remaining Life of Structures in Vertical Mine Shafts Through Integrated Structural Inspection and Maintenance. University of Pretoria, 2025.
Warning: These citations may not always be 100% accurate.