APA (7th ed.) Citation
Adetunji, O. (2024). Heuristic solutions to minimise makespan in a hybrid flow shop scheduling environment with energy consumption constraints in steel making. University of Pretoria.
Chicago Style (17th ed.) Citation
Adetunji, Olufemi. Heuristic Solutions to Minimise Makespan in a Hybrid Flow Shop Scheduling Environment with Energy Consumption Constraints in Steel Making. University of Pretoria, 2024.
MLA (9th ed.) Citation
Adetunji, Olufemi. Heuristic Solutions to Minimise Makespan in a Hybrid Flow Shop Scheduling Environment with Energy Consumption Constraints in Steel Making. University of Pretoria, 2024.
Warning: These citations may not always be 100% accurate.