Full Text Available
Access Full Text at Repository
Access Full Text at Repository
Search Results - act algorithm
-
A heuristic approach application of network modelling
Published 2012Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Optimization of multiple resources for multi-projects
Published 2018Get full text
Get full text
Thesis -
-
Signal processing by octopus cells for acoustic and electrical hearing : a modelling study
Published 2026Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Optimal placement and power allocation for jammers in wireless mesh networks
Published 2016Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Some MIMO applications in cognitive radio networks
Published 2014Get full text
Get full text
Thesis -
Large deformation of rigid-viscoplastic cantilevers subjected to impulsive loading
Published 2016Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Parametric freeform-based construction site layout optimization
Published 2015Get full text
Get full text
Thesis -
-
Optimal sizing and placement of independent power producers on MV, HV and EHV networks for minimum power line losses using neural networks
Published 2025“…In June 2021, the South African president announced the adjustment of schedule 2 of the Electricity Regulation Act. The effect of this adjustment was to increase the National Energy Regulator of South Africa's (NERSA) licensing limit for renewable projects applying for direct connection to the national grid, having export capacities ranging from 1 MW to 100 MW. …”
Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Optimal sizing and placement of independent power producers on MV, HV and EHV networks for minimum power line losses using neural networks
Published 2025“…In June 2021, the South African president announced the adjustment of schedule 2 of the Electricity Regulation Act. The effect of this adjustment was to increase the National Energy Regulator of South Africa's (NERSA) licensing limit for renewable projects applying for direct connection to the national grid, having export capacities ranging from 1 MW to 100 MW. …”
Get full text
ThesisFull Text AvailableAccess Full Text at Repository -
Development of IoT based hybrid autonomous network robots (ANR)
Published 2020Get full text
Get full text
Thesis