Similar Items: The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
- SENTIMENT CLASSIFICATION OF PUBLIC PERCEPTIONS ON RP200 TRILLION HIMBARA STIMULUS USING NAÏVE BAYES
- Rancang Bangun dan Uji Kinerja Mesin Oil Skimmer Disk Type Berdasarkan Volume dan Kadar Ph Pada Cairan Pendingin Mesin CNC Milling Hurco Seri Vm10
- Antenas monopolo de doble banda para captación de energía de radiofrecuencia del medio ambiente
- Maskay Vol. 12 No. 1
- Maskay Vol. 12 No. 2
- Maskay Vol. 13 No. 1