Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)

Saved in:
Bibliographic Details
Published in:Ge-STRAM
Format: Online Article RSS Article
Published: 2026
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!