APA (7th ed.) Citation
(2026). The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM.
Chicago Style (17th ed.) Citation
"The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 Ton Axle Cover on Jl. Simo Kwagean)." Ge-STRAM 2026.
MLA (9th ed.) Citation
"The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 Ton Axle Cover on Jl. Simo Kwagean)." Ge-STRAM, 2026.
Warning: These citations may not always be 100% accurate.