(2026). The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean). Ge-STRAM.
Successfully copied to clipboard
Copying to clipboard failed
Chicago Style (17th ed.) Citation
"The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 Ton Axle Cover on Jl. Simo Kwagean)."
Ge-STRAM 2026.
Successfully copied to clipboard
Copying to clipboard failed
MLA (9th ed.) Citation
"The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 Ton Axle Cover on Jl. Simo Kwagean)."
Ge-STRAM, 2026.
Successfully copied to clipboard
Copying to clipboard failed
Warning: These citations may not always be 100% accurate.