Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
| Published in: | Ge-STRAM |
|---|---|
| Format: | Online Article RSS Article |
| Published: |
2026
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1864030191970418693 |
|---|---|
| collection | WordPress RSS FRELIP Feed Integration |
| container_title | Ge-STRAM |
| description | |
| discipline_display | Engineering & Technology |
| discipline_facet | Engineering & Technology |
| format | Online Article RSS Article |
| genre | Journal Article |
| id | rss_article:10797 |
| institution | FRELIP |
| journal_source_facet | Ge-STRAM |
| publishDate | 2026 |
| publishDateSort | 2026 |
| record_format | rss_article |
| spellingShingle | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) — — — — Electrical and Electronic Engineering Electrical & Electronics Engineering & Technology |
| sub_discipline_display | Electrical & Electronics |
| sub_discipline_facet | Electrical & Electronics |
| subject_display | — — — — Electrical and Electronic Engineering Electrical & Electronics Engineering & Technology — — — — Electrical and Electronic Engineering Electrical & Electronics Engineering & Technology |
| subject_facet | — — — — Electrical and Electronic Engineering Electrical & Electronics Engineering & Technology |
| title | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_auth | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_full | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_fullStr | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_full_unstemmed | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_short | The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean) |
| title_sort | the evaluation of construction project time and cost control using the earned value method (case study of construction of a 200/200 u-ditch channel with 10 ton axle cover on jl. simo kwagean) |
| topic | — — — — Electrical and Electronic Engineering Electrical & Electronics Engineering & Technology |
| url | https://ejournal.unitomo.ac.id/index.php/gestram/article/view/11062 |