Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Using design thinking to enhance construction site problem solving

Problem solving is one of the most important issues in Construction Management (CM), it influences the outcome of the project due to the amount of decisions and problems that the Construction Manager faces in each project. Construction Management is a vital subject that has been in the spotlight of...

Full description

Saved in:
Bibliographic Details
Main Author: Mokhtar, Ehab
Format: Thesis
Published: AUC Knowledge Fountain 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613409442267136
access_status_str Open Access
author Mokhtar, Ehab
author_browse Mokhtar, Ehab
author_facet Mokhtar, Ehab
author_sort Mokhtar, Ehab
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description Problem solving is one of the most important issues in Construction Management (CM), it influences the outcome of the project due to the amount of decisions and problems that the Construction Manager faces in each project. Construction Management is a vital subject that has been in the spotlight of academic research for decades, which led to its emerging by going through the cycles of developing and evolution. The criteria of decision-making and problem solving have also evolved from focusing on the technical and objective aspects of construction to the soft and subjective ones. (Bakht, El Diraby 2015). Nevertheless, the last two decades saw the rise of “Design Thinking” as a new approach for innovation and solving problems in a creative way, it is an approach calls for adapting more subjective, human and innovative problem solving. Design Thinking was adapted in many aspects of social and business life with a great success (Lidtkaj 2014), however, no enough attention were given to it in the construction industry, which gives this research a special importance. In this research, I am trying to examine the efficiency of adapting Design Thinking in solving problems in the construction sites, by means of conducting an experiment to examine whether Design Thinking will enhance problem solving or not. Three simple problems were presented to multidisciplinary 21 participants, they were asked to solve these problems with their traditional (rule-of-thumb) method. Subsequently, they were given a training session on Design Thinking, then they were asked to form small groups to work on the same problems again but this time by using what they have learnt in the Design Thinking session. The experiment showed a great acceptance and understanding to this approach from the participants, over and above, the results have shown a significant enhancement in problem solutions resulted from Design Thinking session compared to traditional method one. The results are encouraging for more research on how we can adapt Design Thinking approach in construction industry, since it proved to have the potential in helping developing Construction Management.
format Thesis
id oai:fount.aucegypt.edu:etds-1310
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:41.195Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1310 Using design thinking to enhance construction site problem solving Mokhtar, Ehab Problem solving is one of the most important issues in Construction Management (CM), it influences the outcome of the project due to the amount of decisions and problems that the Construction Manager faces in each project. Construction Management is a vital subject that has been in the spotlight of academic research for decades, which led to its emerging by going through the cycles of developing and evolution. The criteria of decision-making and problem solving have also evolved from focusing on the technical and objective aspects of construction to the soft and subjective ones. (Bakht, El Diraby 2015). Nevertheless, the last two decades saw the rise of “Design Thinking” as a new approach for innovation and solving problems in a creative way, it is an approach calls for adapting more subjective, human and innovative problem solving. Design Thinking was adapted in many aspects of social and business life with a great success (Lidtkaj 2014), however, no enough attention were given to it in the construction industry, which gives this research a special importance. In this research, I am trying to examine the efficiency of adapting Design Thinking in solving problems in the construction sites, by means of conducting an experiment to examine whether Design Thinking will enhance problem solving or not. Three simple problems were presented to multidisciplinary 21 participants, they were asked to solve these problems with their traditional (rule-of-thumb) method. Subsequently, they were given a training session on Design Thinking, then they were asked to form small groups to work on the same problems again but this time by using what they have learnt in the Design Thinking session. The experiment showed a great acceptance and understanding to this approach from the participants, over and above, the results have shown a significant enhancement in problem solutions resulted from Design Thinking session compared to traditional method one. The results are encouraging for more research on how we can adapt Design Thinking approach in construction industry, since it proved to have the potential in helping developing Construction Management. 2016-02-01T08:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/311 https://fount.aucegypt.edu/context/etds/article/1310/viewcontent/Using_20Design_20Thinking_Ehab_20Mokhtar.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain Problem solving decision making
spellingShingle Problem solving
decision making
Mokhtar, Ehab
Using design thinking to enhance construction site problem solving
title Using design thinking to enhance construction site problem solving
title_full Using design thinking to enhance construction site problem solving
title_fullStr Using design thinking to enhance construction site problem solving
title_full_unstemmed Using design thinking to enhance construction site problem solving
title_short Using design thinking to enhance construction site problem solving
title_sort using design thinking to enhance construction site problem solving
topic Problem solving
decision making
url https://fount.aucegypt.edu/etds/311
https://fount.aucegypt.edu/context/etds/article/1310/viewcontent/Using_20Design_20Thinking_Ehab_20Mokhtar.pdf
work_keys_str_mv AT mokhtarehab usingdesignthinkingtoenhanceconstructionsiteproblemsolving