User friendly progress reporting system for construction projects

Construction is a dynamic and fragmented industry which has many interacting stakeholders’ represented by either individuals or organizations who are involved in a common project for a certain period of time. The simple form for the stakeholders consists of owner, consultant and contractor. As suc...

Full description

Saved in:
Bibliographic Details
Main Author: ElGindi, Mohamed
Format: Thesis
Published: AUC Knowledge Fountain 2017
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613409527201792
access_status_str Open Access
author ElGindi, Mohamed
author_browse ElGindi, Mohamed
author_facet ElGindi, Mohamed
author_sort ElGindi, Mohamed
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description Construction is a dynamic and fragmented industry which has many interacting stakeholders’ represented by either individuals or organizations who are involved in a common project for a certain period of time. The simple form for the stakeholders consists of owner, consultant and contractor. As such, construction industry is depending on appointing a consultant, by the owner, to carry out the design of the project and then assigning a contractor, which is responsible to allocate a team to build and give them the sufficient tool to communicate and report. Each party shall formulate its organization chart for such project and assign a project manager on top of hierarchy of this chart. For all involved stakeholders, managing construction projects requires controlling its running schedule and cost comparing to the planned ones. In order to do that, project managers for each stakeholders need periodical reports that represent the status of the project to predict any potential problems and consider taking the necessary measures on the proper time to maintain the project course and budget. Most problems in the construction industry are referred to communication and reporting problems. The links between the different stakeholders have to be built on a robust communication and reporting system that allows to acquire precise, simple and accurate information. Lack in communication and reporting system, shall result in having a misleading information which consequently lead to wrong decisions. This research tackles the consequences of poor communication and reporting systems and provide some tips to have an effective one. Followed by, describing the current used reporting techniques where their suitability for use is assessed. Furthermore, a user friendly reporting technique is presented where the used data in developing the technique was acquired from literature study and structured interviews with 29 professional expert in construction industry. The proposed technique aims to integrate the communication process to allow project managers to acquire a simple overview about the projects progress and obstacles. The suggested interface is pointing to achieve the balance between simplicity, accuracy and effectiveness with a reasonable cost. Through simple tables and graphs, it gives a quick overview for the managers to understand the status of their projects for each activity and the assigned resources, evaluate the progress through the key performance indicators, predict the problems at early stage and appraise the project’s cash flow to act in a proactive mode not in a reactive one. The proposed interface depends on acquiring on-spot information from each of the project team members about the progress and incurred costs for all project activities through user friendly interface which is designated with its simplicity. Formerly, the acquired information for the progress shall be translated to comprehensive progress report which allows the project manager to understand the status of the project. The offered technique is suitable to be used in any of stakeholders firms as long as it has projects enclose planned activities associated with costs. However, the contractor perspective is considered in this study.
format Thesis
id oai:fount.aucegypt.edu:etds-1382
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:41.195Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2017
publishDateRange 2017
publishDateSort 2017
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1382 User friendly progress reporting system for construction projects ElGindi, Mohamed Construction is a dynamic and fragmented industry which has many interacting stakeholders’ represented by either individuals or organizations who are involved in a common project for a certain period of time. The simple form for the stakeholders consists of owner, consultant and contractor. As such, construction industry is depending on appointing a consultant, by the owner, to carry out the design of the project and then assigning a contractor, which is responsible to allocate a team to build and give them the sufficient tool to communicate and report. Each party shall formulate its organization chart for such project and assign a project manager on top of hierarchy of this chart. For all involved stakeholders, managing construction projects requires controlling its running schedule and cost comparing to the planned ones. In order to do that, project managers for each stakeholders need periodical reports that represent the status of the project to predict any potential problems and consider taking the necessary measures on the proper time to maintain the project course and budget. Most problems in the construction industry are referred to communication and reporting problems. The links between the different stakeholders have to be built on a robust communication and reporting system that allows to acquire precise, simple and accurate information. Lack in communication and reporting system, shall result in having a misleading information which consequently lead to wrong decisions. This research tackles the consequences of poor communication and reporting systems and provide some tips to have an effective one. Followed by, describing the current used reporting techniques where their suitability for use is assessed. Furthermore, a user friendly reporting technique is presented where the used data in developing the technique was acquired from literature study and structured interviews with 29 professional expert in construction industry. The proposed technique aims to integrate the communication process to allow project managers to acquire a simple overview about the projects progress and obstacles. The suggested interface is pointing to achieve the balance between simplicity, accuracy and effectiveness with a reasonable cost. Through simple tables and graphs, it gives a quick overview for the managers to understand the status of their projects for each activity and the assigned resources, evaluate the progress through the key performance indicators, predict the problems at early stage and appraise the project’s cash flow to act in a proactive mode not in a reactive one. The proposed interface depends on acquiring on-spot information from each of the project team members about the progress and incurred costs for all project activities through user friendly interface which is designated with its simplicity. Formerly, the acquired information for the progress shall be translated to comprehensive progress report which allows the project manager to understand the status of the project. The offered technique is suitable to be used in any of stakeholders firms as long as it has projects enclose planned activities associated with costs. However, the contractor perspective is considered in this study. 2017-06-01T07:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/383 https://fount.aucegypt.edu/context/etds/article/1382/viewcontent/Final_20__20Rev_2004_20__20_20May_2014th_2c_202017_20__20M.Sc._20Thesis_20__20Mohamed_20ELGINDI.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain Construction communications information flow
spellingShingle Construction communications
information flow
ElGindi, Mohamed
User friendly progress reporting system for construction projects
title User friendly progress reporting system for construction projects
title_full User friendly progress reporting system for construction projects
title_fullStr User friendly progress reporting system for construction projects
title_full_unstemmed User friendly progress reporting system for construction projects
title_short User friendly progress reporting system for construction projects
title_sort user friendly progress reporting system for construction projects
topic Construction communications
information flow
url https://fount.aucegypt.edu/etds/383
https://fount.aucegypt.edu/context/etds/article/1382/viewcontent/Final_20__20Rev_2004_20__20_20May_2014th_2c_202017_20__20M.Sc._20Thesis_20__20Mohamed_20ELGINDI.pdf
work_keys_str_mv AT elgindimohamed userfriendlyprogressreportingsystemforconstructionprojects