Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Optimization of multiple resources for multi-projects

Optimization of resources is very important in all construction projects. Project managers have to face problems regarding management of cost, time and available resources for single projects. This is more challenging when managing multiple projects. Most of the recent studies focused on optimizatio...

Full description

Saved in:
Bibliographic Details
Main Author: Aboul Fotouh, Sarah
Format: Thesis
Published: AUC Knowledge Fountain 2018
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613409591164928
access_status_str Open Access
author Aboul Fotouh, Sarah
author_browse Aboul Fotouh, Sarah
author_facet Aboul Fotouh, Sarah
author_sort Aboul Fotouh, Sarah
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description Optimization of resources is very important in all construction projects. Project managers have to face problems regarding management of cost, time and available resources for single projects. This is more challenging when managing multiple projects. Most of the recent studies focused on optimization of resources for a single project, or a single resource. This thesis presents a numerical model of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in the construction industry optimize the resources for single projects only. However, with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources, and decreases the fluctuation as much as possible and try to maximize the use of the available pool of resources. The proposed model is user friendly, and it can optimize up to nine resources in three different projects running at the same time. The model is used on the identified critical resources. It calculates the cost of each resource, minimize the cost of extra resources as much as possible and generate the schedule of each project within a selected overall program. The model was verified by different scenarios; 1- optimization of multiple resources of a single project; 2- optimization of single resource of multiple projects; 3- optimization of multiple resources of two projects; 4- optimization of multiple resources of three projects meeting deadlines; 5- optimization of multiple resources of three projects but extending the deadlines. The model was able to decrease the extra cost of resources significantly in all scenarios. To validate the model a case study of several residential villas was chosen to test the model on real projects and the extra cost of resources was reduced significantly without extending the projects time.
format Thesis
id oai:fount.aucegypt.edu:etds-1405
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:41.195Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2018
publishDateRange 2018
publishDateSort 2018
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1405 Optimization of multiple resources for multi-projects Aboul Fotouh, Sarah Optimization of resources is very important in all construction projects. Project managers have to face problems regarding management of cost, time and available resources for single projects. This is more challenging when managing multiple projects. Most of the recent studies focused on optimization of resources for a single project, or a single resource. This thesis presents a numerical model of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in the construction industry optimize the resources for single projects only. However, with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources, and decreases the fluctuation as much as possible and try to maximize the use of the available pool of resources. The proposed model is user friendly, and it can optimize up to nine resources in three different projects running at the same time. The model is used on the identified critical resources. It calculates the cost of each resource, minimize the cost of extra resources as much as possible and generate the schedule of each project within a selected overall program. The model was verified by different scenarios; 1- optimization of multiple resources of a single project; 2- optimization of single resource of multiple projects; 3- optimization of multiple resources of two projects; 4- optimization of multiple resources of three projects meeting deadlines; 5- optimization of multiple resources of three projects but extending the deadlines. The model was able to decrease the extra cost of resources significantly in all scenarios. To validate the model a case study of several residential villas was chosen to test the model on real projects and the extra cost of resources was reduced significantly without extending the projects time. 2018-02-01T08:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/406 https://fount.aucegypt.edu/context/etds/article/1405/viewcontent/Final_20Final_20Sarah_20Aboul_20Fotouh_20thesis_20Final_20Draft_20.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain Cost Optimization Multiple projects
spellingShingle Cost Optimization
Multiple projects
Aboul Fotouh, Sarah
Optimization of multiple resources for multi-projects
title Optimization of multiple resources for multi-projects
title_full Optimization of multiple resources for multi-projects
title_fullStr Optimization of multiple resources for multi-projects
title_full_unstemmed Optimization of multiple resources for multi-projects
title_short Optimization of multiple resources for multi-projects
title_sort optimization of multiple resources for multi projects
topic Cost Optimization
Multiple projects
url https://fount.aucegypt.edu/etds/406
https://fount.aucegypt.edu/context/etds/article/1405/viewcontent/Final_20Final_20Sarah_20Aboul_20Fotouh_20thesis_20Final_20Draft_20.pdf
work_keys_str_mv AT aboulfotouhsarah optimizationofmultipleresourcesformultiprojects