Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Proposed force majeure clause for construction contracts under prevailing laws

Force majeure is one of the most critical risks that affects the obligations of the contract parties in the construction industry. The concept of force majeure, basically, is a civil law concept that is found in the civil codes of most civil law jurisdictions, while common law does not recognize suc...

Full description

Saved in:
Bibliographic Details
Main Author: Abu Helw, Amr Mohammad
Format: Thesis
Published: AUC Knowledge Fountain 2018
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613409633107968
access_status_str Open Access
author Abu Helw, Amr Mohammad
author_browse Abu Helw, Amr Mohammad
author_facet Abu Helw, Amr Mohammad
author_sort Abu Helw, Amr Mohammad
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description Force majeure is one of the most critical risks that affects the obligations of the contract parties in the construction industry. The concept of force majeure, basically, is a civil law concept that is found in the civil codes of most civil law jurisdictions, while common law does not recognize such concept with the same wide definition and application. Occurrence of a Force majeure event can dramatically affect the execution of the contract as it hinders a party of the contract, or both parties, from fulfilling its/their obligations for a reason beyond its/their control and expectation. Thus it is vital to have a well drafted force majeure clause in construction contracts to give an excuse to the affected party from further performance of its obligations under the contract until the expiration of the event or, sometimes, to give a right to terminate the contract. The aim of this research is to propose a force majeure clause applicable to all kinds of construction contracts either governed by a civil law or a common law jurisdiction. To achieve that aim, a questionnaire survey is conducted to explore the opinions and past experience of a selected professional group consisting of twenty five professionals working in the construction field with contract administration background. Based on the finding of literature review, the survey findings, and on a number of contracts the researcher dealt with during his professional life a model clause is developed. The model clause is then verified by obtaining the opinions of three experts in contracts administration. It is also compared with four mega project contracts in several countries. The results of the comparison indicates that the model clause is comprehensive and can be applied to construction contracts to achieve its intended purpose.
format Thesis
id oai:fount.aucegypt.edu:etds-1423
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:41.195Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2018
publishDateRange 2018
publishDateSort 2018
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1423 Proposed force majeure clause for construction contracts under prevailing laws Abu Helw, Amr Mohammad Force majeure is one of the most critical risks that affects the obligations of the contract parties in the construction industry. The concept of force majeure, basically, is a civil law concept that is found in the civil codes of most civil law jurisdictions, while common law does not recognize such concept with the same wide definition and application. Occurrence of a Force majeure event can dramatically affect the execution of the contract as it hinders a party of the contract, or both parties, from fulfilling its/their obligations for a reason beyond its/their control and expectation. Thus it is vital to have a well drafted force majeure clause in construction contracts to give an excuse to the affected party from further performance of its obligations under the contract until the expiration of the event or, sometimes, to give a right to terminate the contract. The aim of this research is to propose a force majeure clause applicable to all kinds of construction contracts either governed by a civil law or a common law jurisdiction. To achieve that aim, a questionnaire survey is conducted to explore the opinions and past experience of a selected professional group consisting of twenty five professionals working in the construction field with contract administration background. Based on the finding of literature review, the survey findings, and on a number of contracts the researcher dealt with during his professional life a model clause is developed. The model clause is then verified by obtaining the opinions of three experts in contracts administration. It is also compared with four mega project contracts in several countries. The results of the comparison indicates that the model clause is comprehensive and can be applied to construction contracts to achieve its intended purpose. 2018-02-01T08:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/424 https://fount.aucegypt.edu/context/etds/article/1423/viewcontent/Thesis_20__20Force_20Majeure_20_18_12_2017__d9_8drev5_Print.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain force majeure civil law
spellingShingle force majeure
civil law
Abu Helw, Amr Mohammad
Proposed force majeure clause for construction contracts under prevailing laws
title Proposed force majeure clause for construction contracts under prevailing laws
title_full Proposed force majeure clause for construction contracts under prevailing laws
title_fullStr Proposed force majeure clause for construction contracts under prevailing laws
title_full_unstemmed Proposed force majeure clause for construction contracts under prevailing laws
title_short Proposed force majeure clause for construction contracts under prevailing laws
title_sort proposed force majeure clause for construction contracts under prevailing laws
topic force majeure
civil law
url https://fount.aucegypt.edu/etds/424
https://fount.aucegypt.edu/context/etds/article/1423/viewcontent/Thesis_20__20Force_20Majeure_20_18_12_2017__d9_8drev5_Print.pdf
work_keys_str_mv AT abuhelwamrmohammad proposedforcemajeureclauseforconstructioncontractsunderprevailinglaws