Cash flow optimization for construction engineering portfolios

One of the main issues in construction projects is finance; proper cash-flow management is necessary to insure that a construction project finishes within time, on budget, and yielding a satisfying profit. Poor financial management might put the contractor, or the owner, in a situation where they ar...

Full description

Saved in:
Bibliographic Details
Main Author: Ali, Gasser Galal
Format: Thesis
Published: AUC Knowledge Fountain 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613410863087616
access_status_str Open Access
author Ali, Gasser Galal
author_browse Ali, Gasser Galal
author_facet Ali, Gasser Galal
author_sort Ali, Gasser Galal
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description One of the main issues in construction projects is finance; proper cash-flow management is necessary to insure that a construction project finishes within time, on budget, and yielding a satisfying profit. Poor financial management might put the contractor, or the owner, in a situation where they are unable to finance the project due to insufficient liquidity, or where they are engaged in excessive loans to finance the project, decreasing the profit, and even creating unsettled debts. Engagement with a portfolio of large construction projects, like infrastructure projects, makes attention to finance more critical, due to large budgets and long project durations, which also requires attention to the time value of money when the project spans over many years and the work environment has a high inflation rate. This thesis aims at the analysis and optimization of the cash-flow request for large engineering portfolios from the contractor's point of view. A computational model, with a friendly user interface, was created to achieve that. The user is able to create a portfolio of projects, and create activities in them with different relationship types, lags, constraints, and costs, as similar to commercial scheduling software. Parameters necessary for the renumeration are also considered, which include the down payment percentage, duration between invoices, duration for payment, retention percentage, etc. The model takes into consideration the time value of money, calculated with an interest rate assigned to the projects by the user; this could be the inflation rate or the (Minimum Attractive Rate of Return) MARR of the contractor. Optimization is done with the objective of maximizing the Net Present Value (NPV) for the projects as a whole, discounted at the start of the portfolio. The variables for the optimization are lags that are assigned for each activity, which, after rescheduling, delays the activities after their early start with the value of those lags, and thus creates a modified cash flow for the project. Optimization of those variables, within scheduling constraints results in a near-optimum NPV. Verification of the model was done using sets of portfolios, and the validation was done using an actual construction portfolio from real life. The results were satisfactory and matched initial expectations. The NPV was successfully optimized to a near optimum. A sensitivity analysis of the model was conducted and it showed that the model behaves as expected for different inputs. A time test was performed, taking into consideration the effect of the size and complexity of a portfolio on the calculation time for the model, and it showed that the speed was satisfactory, though it should be improved. Overall, the conclusion is that the model delivers its goal of maximizing the Net Present Value of a large portfolio as a whole.
format Thesis
id oai:fount.aucegypt.edu:etds-1588
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:42.290Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1588 Cash flow optimization for construction engineering portfolios Ali, Gasser Galal One of the main issues in construction projects is finance; proper cash-flow management is necessary to insure that a construction project finishes within time, on budget, and yielding a satisfying profit. Poor financial management might put the contractor, or the owner, in a situation where they are unable to finance the project due to insufficient liquidity, or where they are engaged in excessive loans to finance the project, decreasing the profit, and even creating unsettled debts. Engagement with a portfolio of large construction projects, like infrastructure projects, makes attention to finance more critical, due to large budgets and long project durations, which also requires attention to the time value of money when the project spans over many years and the work environment has a high inflation rate. This thesis aims at the analysis and optimization of the cash-flow request for large engineering portfolios from the contractor's point of view. A computational model, with a friendly user interface, was created to achieve that. The user is able to create a portfolio of projects, and create activities in them with different relationship types, lags, constraints, and costs, as similar to commercial scheduling software. Parameters necessary for the renumeration are also considered, which include the down payment percentage, duration between invoices, duration for payment, retention percentage, etc. The model takes into consideration the time value of money, calculated with an interest rate assigned to the projects by the user; this could be the inflation rate or the (Minimum Attractive Rate of Return) MARR of the contractor. Optimization is done with the objective of maximizing the Net Present Value (NPV) for the projects as a whole, discounted at the start of the portfolio. The variables for the optimization are lags that are assigned for each activity, which, after rescheduling, delays the activities after their early start with the value of those lags, and thus creates a modified cash flow for the project. Optimization of those variables, within scheduling constraints results in a near-optimum NPV. Verification of the model was done using sets of portfolios, and the validation was done using an actual construction portfolio from real life. The results were satisfactory and matched initial expectations. The NPV was successfully optimized to a near optimum. A sensitivity analysis of the model was conducted and it showed that the model behaves as expected for different inputs. A time test was performed, taking into consideration the effect of the size and complexity of a portfolio on the calculation time for the model, and it showed that the speed was satisfactory, though it should be improved. Overall, the conclusion is that the model delivers its goal of maximizing the Net Present Value of a large portfolio as a whole. 2016-02-01T08:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/589 https://fount.aucegypt.edu/context/etds/article/1588/viewcontent/Thesis_20Final_20Draft2016.1.13_20.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain construction engineering cashflow
spellingShingle construction engineering
cashflow
Ali, Gasser Galal
Cash flow optimization for construction engineering portfolios
title Cash flow optimization for construction engineering portfolios
title_full Cash flow optimization for construction engineering portfolios
title_fullStr Cash flow optimization for construction engineering portfolios
title_full_unstemmed Cash flow optimization for construction engineering portfolios
title_short Cash flow optimization for construction engineering portfolios
title_sort cash flow optimization for construction engineering portfolios
topic construction engineering
cashflow
url https://fount.aucegypt.edu/etds/589
https://fount.aucegypt.edu/context/etds/article/1588/viewcontent/Thesis_20Final_20Draft2016.1.13_20.pdf
work_keys_str_mv AT aligassergalal cashflowoptimizationforconstructionengineeringportfolios