Time-cost Trade-off Analysis for Highway Construction projects

The Construction industry, which can be in the form of residential building, commercial, public and utility buildings, or civil engineering building, has a huge influence on any nation's economy. Its influence can be either manifested in its contribution to the economy or the service it provides to...

Full description

Saved in:
Bibliographic Details
Main Author: Tedla, Tesfu Oqubagabir
Format: Thesis
Published: AUC Knowledge Fountain 2019
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613412007084032
access_status_str Open Access
author Tedla, Tesfu Oqubagabir
author_browse Tedla, Tesfu Oqubagabir
author_facet Tedla, Tesfu Oqubagabir
author_sort Tedla, Tesfu Oqubagabir
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description The Construction industry, which can be in the form of residential building, commercial, public and utility buildings, or civil engineering building, has a huge influence on any nation's economy. Its influence can be either manifested in its contribution to the economy or the service it provides to the community. In order to build any infrastructure project with a balanced cost, time, and quality, project managers search for alternatives that can satisfy these contradicting attributes. The traditional time-cost trade-off was enhanced with the three-dimensional time-cost- quality optimization in the last two decades. The optimization is aimed to minimize the time and cost as much as possible while increasing the quality of the infrastructure to be built. The issue of financing in developing countries has been a bottle neck of success in constructing infrastructure like highway. Many researchers have concluded in their studies the causes of time and cost overrun in high-way construction were, contractors' financial problems, Inflation, progress payments delay by owner, political issues, variations, lack of managemental skills, cost fluctuation of materials during construction, environmental issues, Shortage in equipment, Inadequate contractor experience etc. The number of studies in the literature that deals with financial optimization and cash-flow analysis to address the problem of financing and inflation are getting more attention. The cash-flow analysis and maximum overdraft to be paid give a good indication to the main participants about the trends toward cost and time overrun. They can also help in making a proper decision right at the beginning. The purpose of this study is to deal with the optimization of time and profit of highway constructions taking in to consideration the amount of available credit and future value of the cost of each activity and cash-flow analysis in a comprehensive model. This type of analysis gives the contractor how its profit will be influenced with his allowable credits and the time associated with it. Besides, the model also generates a line of balance scheduling for the project as highways are among the repetitive projects. The cash-flow analysis gives extra information on the overdraft so that it can be optimized to find good combination of execution of the activities which will minimize the overdraft, interest paid to banks and most importantly maximize the profit to be gained by the project using GA approach. This type of analysis also gives alternatives for contractors how much profit would they like to gain by providing different amount of credits. At first the profit and time are optimized individually to get the maximum profit and minimum time for completing the project. Then the multi-objective optimization using goal programing takes place which tries to minimize the deviation from the optimum individual values by assigning importance weight to the individual objectives to find the near optimal solution. The model is tested for different allowable credits and its sensitivity analysis outcomes are plotted to see the relationship between the allowable credits and the profit. To validate the efficiency of the developed model, it is applied to a project from the literature that addresses scheduling and cost optimization of repetitive projects. It is found that the outcome of the model that maximizes the profit and minimizing the time outlooks the results of the literature with 4.65% and 0.38% improvement in duration and cost of the project respectively.
format Thesis
id oai:fount.aucegypt.edu:etds-1778
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:43.583Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2019
publishDateRange 2019
publishDateSort 2019
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1778 Time-cost Trade-off Analysis for Highway Construction projects Tedla, Tesfu Oqubagabir The Construction industry, which can be in the form of residential building, commercial, public and utility buildings, or civil engineering building, has a huge influence on any nation's economy. Its influence can be either manifested in its contribution to the economy or the service it provides to the community. In order to build any infrastructure project with a balanced cost, time, and quality, project managers search for alternatives that can satisfy these contradicting attributes. The traditional time-cost trade-off was enhanced with the three-dimensional time-cost- quality optimization in the last two decades. The optimization is aimed to minimize the time and cost as much as possible while increasing the quality of the infrastructure to be built. The issue of financing in developing countries has been a bottle neck of success in constructing infrastructure like highway. Many researchers have concluded in their studies the causes of time and cost overrun in high-way construction were, contractors' financial problems, Inflation, progress payments delay by owner, political issues, variations, lack of managemental skills, cost fluctuation of materials during construction, environmental issues, Shortage in equipment, Inadequate contractor experience etc. The number of studies in the literature that deals with financial optimization and cash-flow analysis to address the problem of financing and inflation are getting more attention. The cash-flow analysis and maximum overdraft to be paid give a good indication to the main participants about the trends toward cost and time overrun. They can also help in making a proper decision right at the beginning. The purpose of this study is to deal with the optimization of time and profit of highway constructions taking in to consideration the amount of available credit and future value of the cost of each activity and cash-flow analysis in a comprehensive model. This type of analysis gives the contractor how its profit will be influenced with his allowable credits and the time associated with it. Besides, the model also generates a line of balance scheduling for the project as highways are among the repetitive projects. The cash-flow analysis gives extra information on the overdraft so that it can be optimized to find good combination of execution of the activities which will minimize the overdraft, interest paid to banks and most importantly maximize the profit to be gained by the project using GA approach. This type of analysis also gives alternatives for contractors how much profit would they like to gain by providing different amount of credits. At first the profit and time are optimized individually to get the maximum profit and minimum time for completing the project. Then the multi-objective optimization using goal programing takes place which tries to minimize the deviation from the optimum individual values by assigning importance weight to the individual objectives to find the near optimal solution. The model is tested for different allowable credits and its sensitivity analysis outcomes are plotted to see the relationship between the allowable credits and the profit. To validate the efficiency of the developed model, it is applied to a project from the literature that addresses scheduling and cost optimization of repetitive projects. It is found that the outcome of the model that maximizes the profit and minimizing the time outlooks the results of the literature with 4.65% and 0.38% improvement in duration and cost of the project respectively. 2019-06-01T07:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/779 https://fount.aucegypt.edu/context/etds/article/1778/viewcontent/FINAL_20VERSION_20OF_20MY_20THESIS.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain Time-Cost Trade-off Multi-objective Optimization
spellingShingle Time-Cost Trade-off
Multi-objective Optimization
Tedla, Tesfu Oqubagabir
Time-cost Trade-off Analysis for Highway Construction projects
title Time-cost Trade-off Analysis for Highway Construction projects
title_full Time-cost Trade-off Analysis for Highway Construction projects
title_fullStr Time-cost Trade-off Analysis for Highway Construction projects
title_full_unstemmed Time-cost Trade-off Analysis for Highway Construction projects
title_short Time-cost Trade-off Analysis for Highway Construction projects
title_sort time cost trade off analysis for highway construction projects
topic Time-Cost Trade-off
Multi-objective Optimization
url https://fount.aucegypt.edu/etds/779
https://fount.aucegypt.edu/context/etds/article/1778/viewcontent/FINAL_20VERSION_20OF_20MY_20THESIS.pdf
work_keys_str_mv AT tedlatesfuoqubagabir timecosttradeoffanalysisforhighwayconstructionprojects