An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach

Whether forced by economic conditions or internal motivations, contractors may choose to minimize their mark-up margins in order to maximize their chances of winning a bid. Such bidding conditions render contractors sensitive towards all types of risks associated with executing a project. This resea...

Full description

Saved in:
Bibliographic Details
Main Author: Elbashbishy, Tamima Sherif
Format: Thesis
Published: AUC Knowledge Fountain 2019
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613412101455872
access_status_str Open Access
author Elbashbishy, Tamima Sherif
author_browse Elbashbishy, Tamima Sherif
author_facet Elbashbishy, Tamima Sherif
author_sort Elbashbishy, Tamima Sherif
collection Thesis
dc_rights_str_mv The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
description Whether forced by economic conditions or internal motivations, contractors may choose to minimize their mark-up margins in order to maximize their chances of winning a bid. Such bidding conditions render contractors sensitive towards all types of risks associated with executing a project. This research aims at providing contractors with a framework through which they can reduce their bid prices to be able to compete in low biding conditions. This aim is realized through identifying risk elements that have the greatest impact on projects’ costs in the Egyptian construction industry. Work on this research follows a risk path approach consisting of risk sources, risk events, and risk consequences, and vulnerability factors consisting of robustness factors, resistance factors and sensitivity factors, whose relationships and risk paths are mapped through an ontology model. The weights characterizing that relationship between each of these elements is estimated through a three-phase model that utilizes both optimization and Artificial Neural Networks (ANN), through 52 risks cenarios collected from 35 experts in the Egyptian Construction industry. Outputs generated by the model comprise of five sets of weights. Each set represents the effect of one risk path element on a subsequent element, collectively demonstrating the relations connecting the risk path elements to cost overruns. The model’s outputs showed that that 35 percent of the top 20 Robustness factors are related to project design. Lack of contractor’s technical resources rank higher than that of contractor’s financial resources in terms of their effect on Risk events. Project type has the most impact on project cost overrun, followed by Project delivery method. Further, delays due to bureaucracy whether from the owner or the government’s side rank at the bottom of the list.
format Thesis
id oai:fount.aucegypt.edu:etds-1800
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:43.583Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2019
publishDateRange 2019
publishDateSort 2019
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-1800 An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach Elbashbishy, Tamima Sherif Whether forced by economic conditions or internal motivations, contractors may choose to minimize their mark-up margins in order to maximize their chances of winning a bid. Such bidding conditions render contractors sensitive towards all types of risks associated with executing a project. This research aims at providing contractors with a framework through which they can reduce their bid prices to be able to compete in low biding conditions. This aim is realized through identifying risk elements that have the greatest impact on projects’ costs in the Egyptian construction industry. Work on this research follows a risk path approach consisting of risk sources, risk events, and risk consequences, and vulnerability factors consisting of robustness factors, resistance factors and sensitivity factors, whose relationships and risk paths are mapped through an ontology model. The weights characterizing that relationship between each of these elements is estimated through a three-phase model that utilizes both optimization and Artificial Neural Networks (ANN), through 52 risks cenarios collected from 35 experts in the Egyptian Construction industry. Outputs generated by the model comprise of five sets of weights. Each set represents the effect of one risk path element on a subsequent element, collectively demonstrating the relations connecting the risk path elements to cost overruns. The model’s outputs showed that that 35 percent of the top 20 Robustness factors are related to project design. Lack of contractor’s technical resources rank higher than that of contractor’s financial resources in terms of their effect on Risk events. Project type has the most impact on project cost overrun, followed by Project delivery method. Further, delays due to bureaucracy whether from the owner or the government’s side rank at the bottom of the list. 2019-06-01T07:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/801 https://fount.aucegypt.edu/context/etds/article/1800/viewcontent/Thesis_20Submission_20__20Tamima_20Elbashbishy_20.pdf The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy. Theses and Dissertations AUC Knowledge Fountain Risk Management Ontology
spellingShingle Risk Management
Ontology
Elbashbishy, Tamima Sherif
An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title_full An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title_fullStr An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title_full_unstemmed An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title_short An Ontology Framework for Addressing Cost Overrun through Risk Modeling: A Risk Path Approach
title_sort ontology framework for addressing cost overrun through risk modeling a risk path approach
topic Risk Management
Ontology
url https://fount.aucegypt.edu/etds/801
https://fount.aucegypt.edu/context/etds/article/1800/viewcontent/Thesis_20Submission_20__20Tamima_20Elbashbishy_20.pdf
work_keys_str_mv AT elbashbishytamimasherif anontologyframeworkforaddressingcostoverrunthroughriskmodelingariskpathapproach
AT elbashbishytamimasherif ontologyframeworkforaddressingcostoverrunthroughriskmodelingariskpathapproach