Analysis of concurrent delays in the construction industry

Most of construction projects suffer from delays. These delays could be due to several reasons such as, poor design, poor planning and variation orders. The most controversial type of delays in the construction industry is the concurrent delay. Ambiguity usually surrounds the concurrent delays when...

Full description

Saved in:
Bibliographic Details
Main Author: El Hakim, Yasmin
Format: Thesis
Published: AUC Knowledge Fountain 2020
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613418472603648
access_status_str Open Access
author El Hakim, Yasmin
author_browse El Hakim, Yasmin
author_facet El Hakim, Yasmin
author_sort El Hakim, Yasmin
collection Thesis
description Most of construction projects suffer from delays. These delays could be due to several reasons such as, poor design, poor planning and variation orders. The most controversial type of delays in the construction industry is the concurrent delay. Ambiguity usually surrounds the concurrent delays when they exist in the project because they do not have a unified or agreed upon definition. In addition, there are different remedy theories in terms of time and cost when they arise. Therefore, the aim of this research is to highlight how the Egyptian Law perceive concurrency; in addition to performing a comprehensive literature review for the accepted definitions for concurrent delays. The scope of this literature includes how different countries law define concurrency and its remedy including Egyptian Law, English Law and the US Law. In addition, the literature also includes how different internationally recognized protocols recommends the definition for concurrency and its reimbursement including the Association for the advancement of cost engineering (AACE) 2011, the Society of Construction Law (SCL) 2017, and the American Society of civil engineers (ASCE) 2016. Furthermore, the literature also shows how different standards forms of contracts identify concurrency and its consequences including FIDIC 2017 & NEC3. After that, this research proposes an analytical model that will help the user to identify concurrency and will output the delay responsibility for each party and the extension of time that should be granted to the contractor. The model includes the three internationally accepted standards (i.e.: AACE, SCL Protocol & ASCE) for the user to select from. The model is developed using MS visual basic programming language because of its wide array of functions and availability. Then, it was initially tested using different “what if scenarios” to determine its validity and limitations. After that, it was validated using actual project data where the final result was compared to both the contractor claim and the consultant’s counter claim. After verification & validation, the model proved its validity. Therefore, this model could be considered a useful tool for claim management, as it provides acceptable evidence in case of concurrency allowing the user to choose the best suitable concurrency analysis approach to the project.
format Thesis
id oai:fount.aucegypt.edu:etds-2458
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:48.888Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2020
publishDateRange 2020
publishDateSort 2020
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-2458 Analysis of concurrent delays in the construction industry El Hakim, Yasmin Most of construction projects suffer from delays. These delays could be due to several reasons such as, poor design, poor planning and variation orders. The most controversial type of delays in the construction industry is the concurrent delay. Ambiguity usually surrounds the concurrent delays when they exist in the project because they do not have a unified or agreed upon definition. In addition, there are different remedy theories in terms of time and cost when they arise. Therefore, the aim of this research is to highlight how the Egyptian Law perceive concurrency; in addition to performing a comprehensive literature review for the accepted definitions for concurrent delays. The scope of this literature includes how different countries law define concurrency and its remedy including Egyptian Law, English Law and the US Law. In addition, the literature also includes how different internationally recognized protocols recommends the definition for concurrency and its reimbursement including the Association for the advancement of cost engineering (AACE) 2011, the Society of Construction Law (SCL) 2017, and the American Society of civil engineers (ASCE) 2016. Furthermore, the literature also shows how different standards forms of contracts identify concurrency and its consequences including FIDIC 2017 & NEC3. After that, this research proposes an analytical model that will help the user to identify concurrency and will output the delay responsibility for each party and the extension of time that should be granted to the contractor. The model includes the three internationally accepted standards (i.e.: AACE, SCL Protocol & ASCE) for the user to select from. The model is developed using MS visual basic programming language because of its wide array of functions and availability. Then, it was initially tested using different “what if scenarios” to determine its validity and limitations. After that, it was validated using actual project data where the final result was compared to both the contractor claim and the consultant’s counter claim. After verification & validation, the model proved its validity. Therefore, this model could be considered a useful tool for claim management, as it provides acceptable evidence in case of concurrency allowing the user to choose the best suitable concurrency analysis approach to the project. 2020-05-14T07:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/1450 https://fount.aucegypt.edu/context/etds/article/2458/viewcontent/THesis_FINAL.pdf Theses and Dissertations AUC Knowledge Fountain Concurrent Delays||Delays in the Construction Industry
spellingShingle Concurrent Delays||Delays in the Construction Industry
El Hakim, Yasmin
Analysis of concurrent delays in the construction industry
title Analysis of concurrent delays in the construction industry
title_full Analysis of concurrent delays in the construction industry
title_fullStr Analysis of concurrent delays in the construction industry
title_full_unstemmed Analysis of concurrent delays in the construction industry
title_short Analysis of concurrent delays in the construction industry
title_sort analysis of concurrent delays in the construction industry
topic Concurrent Delays||Delays in the Construction Industry
url https://fount.aucegypt.edu/etds/1450
https://fount.aucegypt.edu/context/etds/article/2458/viewcontent/THesis_FINAL.pdf
work_keys_str_mv AT elhakimyasmin analysisofconcurrentdelaysintheconstructionindustry