Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

The effect of learning and cost optimization on line of balance scheduling

The increase in populations throughout the past years introduced the need for improving and increasing countries’ infrastructure. Moreover, there has been an increasing demand for dwelling units ranging from small economic housing blocks to high-rise buildings and residential villa compounds. These...

Full description

Saved in:
Bibliographic Details
Main Author: Zahran, Kareem Essam
Format: Thesis
Published: AUC Knowledge Fountain 2014
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613421000720384
access_status_str Open Access
author Zahran, Kareem Essam
author_browse Zahran, Kareem Essam
author_facet Zahran, Kareem Essam
author_sort Zahran, Kareem Essam
collection Thesis
description The increase in populations throughout the past years introduced the need for improving and increasing countries’ infrastructure. Moreover, there has been an increasing demand for dwelling units ranging from small economic housing blocks to high-rise buildings and residential villa compounds. These projects are known by their repetitive nature, where a constant unit is repeated several times. Scheduling techniques that consider the learning effect as an influencing parameter in calculating productivity rates can improve the effectiveness of the scheduling process. This achieves more realistic forecasts resulting in optimum utilization of resources and better control during implementation phases. Linear scheduling techniques are being used in scheduling projects of a repetitive nature. The aim of this research is to develop a framework which helps schedulers include the learning effect and cost/time optimization in line of balance scheduling during the planning and monitoring phases of construction projects. This framework achieves several objectives such as (1) improving the performance of the LOB scheduling by considering the learning effect to develop more realistic schedules, (2) supporting decision makers in achieving schedules that would optimize time and cost, and (3) incorporating actual performance data on site by continuously updating the learning rates based on actual data extracted from monitoring activities on site. A spreadsheet modeling tool was used to apply the developed approach. Furthermore, a hypothetical case study was applied to verify the developed approach and to prove that the model gives accurate results. The developed tool proved to provide the planner/scheduler with near optimum costs, durations, and resources due to applying learning and cost/time optimization. One of the major achievements of this tool is that it presents a realistic LOB Schedule that is continuously updated to reflect both current and forecasted productivity rates of activities until the end of the project. Furthermore, the developed model was validated through (1) applying it on two real life case studies where their outputs were compared to actual results and (2) distributing a questionnaire to construction experts to get their feedback on the developed framework and model. Results of the validation show that the system is robust, flexible, gives accurate results and is considered useful for the industry.
format Thesis
id oai:fount.aucegypt.edu:etds-2856
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:51.500Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2014
publishDateRange 2014
publishDateSort 2014
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-2856 The effect of learning and cost optimization on line of balance scheduling Zahran, Kareem Essam The increase in populations throughout the past years introduced the need for improving and increasing countries’ infrastructure. Moreover, there has been an increasing demand for dwelling units ranging from small economic housing blocks to high-rise buildings and residential villa compounds. These projects are known by their repetitive nature, where a constant unit is repeated several times. Scheduling techniques that consider the learning effect as an influencing parameter in calculating productivity rates can improve the effectiveness of the scheduling process. This achieves more realistic forecasts resulting in optimum utilization of resources and better control during implementation phases. Linear scheduling techniques are being used in scheduling projects of a repetitive nature. The aim of this research is to develop a framework which helps schedulers include the learning effect and cost/time optimization in line of balance scheduling during the planning and monitoring phases of construction projects. This framework achieves several objectives such as (1) improving the performance of the LOB scheduling by considering the learning effect to develop more realistic schedules, (2) supporting decision makers in achieving schedules that would optimize time and cost, and (3) incorporating actual performance data on site by continuously updating the learning rates based on actual data extracted from monitoring activities on site. A spreadsheet modeling tool was used to apply the developed approach. Furthermore, a hypothetical case study was applied to verify the developed approach and to prove that the model gives accurate results. The developed tool proved to provide the planner/scheduler with near optimum costs, durations, and resources due to applying learning and cost/time optimization. One of the major achievements of this tool is that it presents a realistic LOB Schedule that is continuously updated to reflect both current and forecasted productivity rates of activities until the end of the project. Furthermore, the developed model was validated through (1) applying it on two real life case studies where their outputs were compared to actual results and (2) distributing a questionnaire to construction experts to get their feedback on the developed framework and model. Results of the validation show that the system is robust, flexible, gives accurate results and is considered useful for the industry. 2014-07-01T07:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/1828 https://fount.aucegypt.edu/context/etds/article/2856/viewcontent/Masters_Thesis___Final___Kareem_Zahran.pdf Theses and Dissertations AUC Knowledge Fountain Productivity Assembly-line balancing Learning Monitorring Control Construction Engineering and Management
spellingShingle Productivity
Assembly-line balancing
Learning
Monitorring
Control
Construction Engineering and Management
Zahran, Kareem Essam
The effect of learning and cost optimization on line of balance scheduling
title The effect of learning and cost optimization on line of balance scheduling
title_full The effect of learning and cost optimization on line of balance scheduling
title_fullStr The effect of learning and cost optimization on line of balance scheduling
title_full_unstemmed The effect of learning and cost optimization on line of balance scheduling
title_short The effect of learning and cost optimization on line of balance scheduling
title_sort effect of learning and cost optimization on line of balance scheduling
topic Productivity
Assembly-line balancing
Learning
Monitorring
Control
Construction Engineering and Management
url https://fount.aucegypt.edu/etds/1828
https://fount.aucegypt.edu/context/etds/article/2856/viewcontent/Masters_Thesis___Final___Kareem_Zahran.pdf
work_keys_str_mv AT zahrankareemessam theeffectoflearningandcostoptimizationonlineofbalancescheduling
AT zahrankareemessam effectoflearningandcostoptimizationonlineofbalancescheduling