Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships

Proper planning is a key factor in all business endeavors. This is especially important in the construction industry as a project is sensitive to countless factors that affect the project's time and cost. This created the need for agile and flexible schedules for close monitoring and dynamic plannin...

Full description

Saved in:
Bibliographic Details
Main Author: Elsabagh, Amr
Format: Thesis
Published: AUC Knowledge Fountain 2025
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613424259694592
access_status_str Open Access
author Elsabagh, Amr
author_browse Elsabagh, Amr
author_facet Elsabagh, Amr
author_sort Elsabagh, Amr
collection Thesis
description Proper planning is a key factor in all business endeavors. This is especially important in the construction industry as a project is sensitive to countless factors that affect the project's time and cost. This created the need for agile and flexible schedules for close monitoring and dynamic planning for construction projects. The currently prevailing scheduling techniques are CPM and PERT, which professionals in the field widely use. These methods create static schedules that are vulnerable to any changes in the schedule logic, which often happens during construction projects. In addition, these Scheduling techniques do not capture the uncertainties and complex relationships well, which makes them susceptible to cost and schedule overruns. Usually, to overcome this, decision-makers develop a recovery plan that takes time and effort, and even these plans typically take tremendous effort to develop and implement. Instead, if decision-makers had access to a tool that provided them with different scenarios in order to prepare proper risk response techniques that provided dynamic responses to emergencies, this would save a lot of time and resources. In the literature, limited work was found to provide a scheduling method that considers different execution scenarios and the corresponding implications. Hence, there is a need to develop an innovative method which can increase flexibility and provide adaptation and agility to schedules. The goal of this research is to develop a novel scheduling method based on conditional relationships and stochastic inter-activity associations, which tackles the shortcomings of current deterministic and limited stochastic scheduling techniques. This research utilizes the discrete event simulation on AnyLogic software to model the behavior of activities in stochastic networks to determine the overall project completion. In this model, each activity is simulated by an agent that has certain parameters duration, probability of occurrence, predecessor, and successor. Those agents are then evaluated in the constructed network and this process is repeated for 100 runs. The findings of the model have been compared against the findings of another simulation technique using a case study for historical rehabilitation. While other stochastic models estimated the project duration to be 24.14 days and deterministic models estimated 20.55 days, the model developed in this study estimated a project completion time of 26.4 days, which is the closest to the actual project duration of 35 days. This research has various potential applications, both strategic and project-specific. Strategically, they can offer top management a decision support tool, supplying sufficient information for making long-term strategic decisions and preparing for different scenarios. At the project level, this tool enables project managers to simulate the complexities of construction projects, which often necessitate a proactive approach. This allows project managers to anticipate different scenarios from the project's outset and develop mitigation plans accordingly.
format Thesis
id oai:fount.aucegypt.edu:etds-3448
institution American University in Cairo (Egypt)
last_indexed 2026-06-10T12:35:55.364Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from AUC Knowledge Fountain — bepress
publishDate 2025
publishDateRange 2025
publishDateSort 2025
publisher AUC Knowledge Fountain
publisherStr AUC Knowledge Fountain
record_format dspace
source_str AUC Knowledge Fountain — bepress
spelling oai:fount.aucegypt.edu:etds-3448 Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships Elsabagh, Amr Proper planning is a key factor in all business endeavors. This is especially important in the construction industry as a project is sensitive to countless factors that affect the project's time and cost. This created the need for agile and flexible schedules for close monitoring and dynamic planning for construction projects. The currently prevailing scheduling techniques are CPM and PERT, which professionals in the field widely use. These methods create static schedules that are vulnerable to any changes in the schedule logic, which often happens during construction projects. In addition, these Scheduling techniques do not capture the uncertainties and complex relationships well, which makes them susceptible to cost and schedule overruns. Usually, to overcome this, decision-makers develop a recovery plan that takes time and effort, and even these plans typically take tremendous effort to develop and implement. Instead, if decision-makers had access to a tool that provided them with different scenarios in order to prepare proper risk response techniques that provided dynamic responses to emergencies, this would save a lot of time and resources. In the literature, limited work was found to provide a scheduling method that considers different execution scenarios and the corresponding implications. Hence, there is a need to develop an innovative method which can increase flexibility and provide adaptation and agility to schedules. The goal of this research is to develop a novel scheduling method based on conditional relationships and stochastic inter-activity associations, which tackles the shortcomings of current deterministic and limited stochastic scheduling techniques. This research utilizes the discrete event simulation on AnyLogic software to model the behavior of activities in stochastic networks to determine the overall project completion. In this model, each activity is simulated by an agent that has certain parameters duration, probability of occurrence, predecessor, and successor. Those agents are then evaluated in the constructed network and this process is repeated for 100 runs. The findings of the model have been compared against the findings of another simulation technique using a case study for historical rehabilitation. While other stochastic models estimated the project duration to be 24.14 days and deterministic models estimated 20.55 days, the model developed in this study estimated a project completion time of 26.4 days, which is the closest to the actual project duration of 35 days. This research has various potential applications, both strategic and project-specific. Strategically, they can offer top management a decision support tool, supplying sufficient information for making long-term strategic decisions and preparing for different scenarios. At the project level, this tool enables project managers to simulate the complexities of construction projects, which often necessitate a proactive approach. This allows project managers to anticipate different scenarios from the project's outset and develop mitigation plans accordingly. 2025-01-31T08:00:00Z thesis application/pdf https://fount.aucegypt.edu/etds/2400 https://fount.aucegypt.edu/context/etds/article/3448/viewcontent/Amr_Elsabagh_Thesis.pdf Theses and Dissertations AUC Knowledge Fountain Construction Management Construction Scheduling Discrete Event Simulation Stochastic Relationships Construction Engineering and Management
spellingShingle Construction Management
Construction Scheduling
Discrete Event Simulation
Stochastic Relationships
Construction Engineering and Management
Elsabagh, Amr
Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title_full Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title_fullStr Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title_full_unstemmed Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title_short Advanced Construction Scheduling: Capturing Conditional and Stochastic Relationships
title_sort advanced construction scheduling capturing conditional and stochastic relationships
topic Construction Management
Construction Scheduling
Discrete Event Simulation
Stochastic Relationships
Construction Engineering and Management
url https://fount.aucegypt.edu/etds/2400
https://fount.aucegypt.edu/context/etds/article/3448/viewcontent/Amr_Elsabagh_Thesis.pdf
work_keys_str_mv AT elsabaghamr advancedconstructionschedulingcapturingconditionalandstochasticrelationships