Factors influencing construction projects delays in national vocation training institute NVTI

The thesis submitted to the Department of Construction Technology and Management in partial fulfillment of the requirements for the Degree of Master of Science

Saved in:
Bibliographic Details
Main Author: Oppong, Joseph Kwabena
Format: Thesis
Language:en_US
Published: 2021
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613137983766528
access_status_str Open Access
author Oppong, Joseph Kwabena
author_browse Oppong, Joseph Kwabena
author_facet Oppong, Joseph Kwabena
author_sort Oppong, Joseph Kwabena
collection Thesis
description The thesis submitted to the Department of Construction Technology and Management in partial fulfillment of the requirements for the Degree of Master of Science
format Thesis
id oai:ir.knust.edu.gh:123456789/13946
institution KNUST (Ghana)
language en_US
last_indexed 2026-06-10T12:31:22.621Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2021
publishDateRange 2021
publishDateSort 2021
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/13946 Factors influencing construction projects delays in national vocation training institute NVTI Oppong, Joseph Kwabena Delay Factors Factors NVTI, The thesis submitted to the Department of Construction Technology and Management in partial fulfillment of the requirements for the Degree of Master of Science Construction projects in National Vocational Training Institute (NVTI) have experienced several challenges with the strong challenge of delays of the projects. Numerous factors influenced this issue of construction project delays, and the aim of the study was to explore the causative factors influencing construction projects delays in NVTI. The objectives were: to identify factors which influence construction project delays in NVTI, to provide solutions / mitigation measures to reduce construction projects delays in NVTI. The study made use of quantitative approach of enquiry through survey questionnaires. A sum total of seventy – two (72) questionnaires were administered and sixty – two (62) responses were retrieved from NVTI Staff representing the client, Contractors and Consultants (project managers, architects, quantity surveyors, works engineers) who have previously executed NVTI construction projects indicating a high response rate of 86%. The analysis of the data gathered was done using descriptive statistics (frequencies, percentages) and mean score ranking. The study revealed that, there were sixteen (16) factors which influence construction project delays but ten (10) of them were identified as the key ones and include; Lack of adequate budgetary support, Inadequate funding allocation, Time and Cost overrun Lack of effective communication between parties, Slow in decision making. Design errors and omissions / Poorly defined scope/ specification of work Contractor‘s financial difficulties / Use of obsolete plant and equipment, Poor project management practices on a project site, inadequate experience of consultants Lack of vehicles for monitoring and supervision of works. It was recommended that the government should make adequate funds available before the start of every contract, contractors should practice proper site management whereas the consultants should also do due diligence to avoid errors and put in place good project management practices. KNUST 2021-06-15T14:05:33Z 2023-04-19T03:25:00Z 2021-06-15T14:05:33Z 2023-04-19T03:25:00Z 2021-06-15 Thesis https://ir.knust.edu.gh/handle/123456789/13946 en_US application/pdf
spellingShingle Delay
Factors
Factors
NVTI,
Oppong, Joseph Kwabena
Factors influencing construction projects delays in national vocation training institute NVTI
title Factors influencing construction projects delays in national vocation training institute NVTI
title_full Factors influencing construction projects delays in national vocation training institute NVTI
title_fullStr Factors influencing construction projects delays in national vocation training institute NVTI
title_full_unstemmed Factors influencing construction projects delays in national vocation training institute NVTI
title_short Factors influencing construction projects delays in national vocation training institute NVTI
title_sort factors influencing construction projects delays in national vocation training institute nvti
topic Delay
Factors
Factors
NVTI,
url https://ir.knust.edu.gh/handle/123456789/13946
work_keys_str_mv AT oppongjosephkwabena factorsinfluencingconstructionprojectsdelaysinnationalvocationtraininginstitutenvti
AT factorsinfluencingconstructionprojectsdelaysinnationalvocationtraininginstitutenvti