Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly

A thesis submitted to the Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi in partial fulfillment of the requirement for the Award Degree of Master of Science in Project Management

Saved in:
Bibliographic Details
Main Author: Odei Akrofi, Richard
Format: Thesis
Language:en_US
Published: 2021
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613139007176704
access_status_str Open Access
author Odei Akrofi, Richard
author_browse Odei Akrofi, Richard
author_facet Odei Akrofi, Richard
author_sort Odei Akrofi, Richard
collection Thesis
description A thesis submitted to the Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi in partial fulfillment of the requirement for the Award Degree of Master of Science in Project Management
format Thesis
id oai:ir.knust.edu.gh:123456789/13974
institution KNUST (Ghana)
language en_US
last_indexed 2026-06-10T12:31:23.640Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2021
publishDateRange 2021
publishDateSort 2021
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/13974 Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly Odei Akrofi, Richard Infrastructural projects Challenges Political interference Project delivery A thesis submitted to the Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi in partial fulfillment of the requirement for the Award Degree of Master of Science in Project Management Infrastructural assets in a community or country determines the quality of life of the people. In view of the above, it has been on the policy directives of the government of Ghana to increase infrastructure assets delivery in the country through the Metropolitan, Municipal and District Assemblies (MMDAs). The current study sought to assess the challenges faced by MMDAs in the delivery of infrastructure projects using the Awutu Senya District as a case study. Adopting a case study research design and qualitative research strategy, data was collected from key management personnel who play key role in developmental projects. The data collection was done using interviews. Data analysis was done using content and thematic analysis. From the results of the study, it was found that the Awutu Senya District Assembly embark on a number of developmental projects to meet the needs of their people. Despite the effort there still exist a huge infrastructure gaps that needs to be filled. This infrastructure gap was created as a results of inadequate funds. It was also found that the main challenges to infrastructure delivery by the assembly include political interference, Insufficient funds for project delivery, delay in release of funds by the Central government, abandonment of projects, lack of stakeholder involvement in project delivery, poor planning, delays in project delivery, project cost overruns, over awarding of contracts and delay in payment to contractors for work done. In view of the above it was recommended that the works done by the assembly should be devoid of political interference and conflict of interest. Moreover, adequate funds should be available before commencement of a project to avoid delays in project delivery and abandonment of projects. Stakeholders should also be involved in project planning and delivery. KNUST 2021-06-17T10:50:23Z 2023-04-19T03:29:54Z 2021-06-17T10:50:23Z 2023-04-19T03:29:54Z 2021-06-17 Thesis https://ir.knust.edu.gh/handle/123456789/13974 en_US application/pdf
spellingShingle Infrastructural projects
Challenges
Political interference
Project delivery
Odei Akrofi, Richard
Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title_full Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title_fullStr Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title_full_unstemmed Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title_short Analysing the challenges associated with infrastructural project execution in the Awutu Senya District Assembly
title_sort analysing the challenges associated with infrastructural project execution in the awutu senya district assembly
topic Infrastructural projects
Challenges
Political interference
Project delivery
url https://ir.knust.edu.gh/handle/123456789/13974
work_keys_str_mv AT odeiakrofirichard analysingthechallengesassociatedwithinfrastructuralprojectexecutionintheawutusenyadistrictassembly
AT analysingthechallengesassociatedwithinfrastructuralprojectexecutionintheawutusenyadistrictassembly