Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.

A Thesis Submitted To The Department Of Accounting And Finance In Partial Fulfillment Of The Requirements For The Degree Of Master Of Business Administration (Finance).

Saved in:
Bibliographic Details
Main Author: DODOU, RICHMOND
Format: Thesis
Language:English
Published: KNUST 2025
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613139023953920
access_status_str Open Access
author DODOU, RICHMOND
author_browse DODOU, RICHMOND
author_facet DODOU, RICHMOND
author_sort DODOU, RICHMOND
collection Thesis
description A Thesis Submitted To The Department Of Accounting And Finance In Partial Fulfillment Of The Requirements For The Degree Of Master Of Business Administration (Finance).
format Thesis
id oai:ir.knust.edu.gh:123456789/16375
institution KNUST (Ghana)
language English
last_indexed 2026-06-10T12:31:23.640Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2025
publishDateRange 2025
publishDateSort 2025
publisher KNUST
publisherStr KNUST
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/16375 Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods. DODOU, RICHMOND A Thesis Submitted To The Department Of Accounting And Finance In Partial Fulfillment Of The Requirements For The Degree Of Master Of Business Administration (Finance). This study assesses the financing of municipal projects in the Upper Denkyira East Municipal Assembly (UDEMA): a comparison of Build- Operate- Transfer (BOT) system and Traditional Procurement Methods (TPM). The study employed a cross sectional survey research design. A purposive sampling approach was adopted in selecting the respondents who are the main participants in the procurement process. In all a total of 50 respondents were sampled. The study employed a well-structured questionnaire. The study reveals that among the factors causing delay of BOT projects include political risk, environmental concerns and restriction, delay in obtaining permission and financial risk. On the traditionally procured projects, contractors experience in planning and controlling, delays in the approval of design documents and delays in payment by owner and difficulties in financing are the causes of delays of projects. A comparison of the effectiveness of BOT and TPM indicate BOT is more effective than TPM on the basis of time taken to negotiate/award of contract, time taken to deliver the asset, cheaper transaction cost, funding arrangement and budget certainty, whole life maintenance and construction innovation. Critical success factors of BOT projections outweighs that of TPM projects in terms of strong construction and financial market. It was also revealed that clients, cost, time, risk, project characteristics and external environment statistically and significantly influence the selection of procurement methods. It can be conclude that the BOT as a variant of public private partnership has proved to be a viable alternative in financing municipal projects apart from the traditional procurement methods. KNUST 2025-03-05T15:27:31Z 2025-03-05T15:27:31Z 2016-09 Thesis https://ir.knust.edu.gh/handle/123456789/16375 en application/pdf KNUST
spellingShingle DODOU, RICHMOND
Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title_full Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title_fullStr Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title_full_unstemmed Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title_short Financing municipal projects in upper Denkyira east municipal assembly: A comparison of build-operate- transfer and traditional procurement methods.
title_sort financing municipal projects in upper denkyira east municipal assembly a comparison of build operate transfer and traditional procurement methods
url https://ir.knust.edu.gh/handle/123456789/16375
work_keys_str_mv AT dodourichmond financingmunicipalprojectsinupperdenkyiraeastmunicipalassemblyacomparisonofbuildoperatetransferandtraditionalprocurementmethods