Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia

A thesis submitted to the Board of Postgraduate Studies, Kwame Nkrumah University of Science and Technology, Kumasi, in partial fulfilment of the requirements for the award of Postgraduate Professional Diploma in Mining Engineering.

Saved in:
Bibliographic Details
Main Author: Ashong, Emmanuel Tettey
Format: Thesis
Language:English
Published: 2012
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613139041779713
access_status_str Open Access
author Ashong, Emmanuel Tettey
author_browse Ashong, Emmanuel Tettey
author_facet Ashong, Emmanuel Tettey
author_sort Ashong, Emmanuel Tettey
collection Thesis
description A thesis submitted to the Board of Postgraduate Studies, Kwame Nkrumah University of Science and Technology, Kumasi, in partial fulfilment of the requirements for the award of Postgraduate Professional Diploma in Mining Engineering.
format Thesis
id oai:ir.knust.edu.gh:123456789/3394
institution KNUST (Ghana)
language English
last_indexed 2026-06-10T12:31:23.640Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2012
publishDateRange 2012
publishDateSort 2012
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/3394 Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia Ashong, Emmanuel Tettey A thesis submitted to the Board of Postgraduate Studies, Kwame Nkrumah University of Science and Technology, Kumasi, in partial fulfilment of the requirements for the award of Postgraduate Professional Diploma in Mining Engineering. At Ghana Consolidated Diamonds Limited (GCD), production figures for the past four years indicate that there is a significant difference between the estimated ore reserve and what is actually obtained at the end of a mining programme. While other unit operations like the mining method and the efficiency of the treatment plants may be contributing to this disparity, one of the major reasons could be that the current estimation method is not adequately reliable. The objective of this thesis is to assess the current method of ore reserve estimation on the mine and to investigate other estimation method that may be applicable. The standard arithmetic method, which is the current estimation method on the mine, has been used to estimate reserves in a selected area of the GCD concession. The triangular and geostatistical methods were used to estimate the reserves within the selected area. The justification for choosing the triangular method has been outlined. The applicability of geostatistical method has also been justified by the fact that the grade distribution of the different geological regions within the selected area could be fitted with the spherical semi-variogram models. It is suggested that the current estimation is good since the tonnages estimated using this method 1ie in between those of the other two methods However, the estimated grades and the variances were least in the case of geostatistical method. If the drilling programme could be intensified to produce adequate samples, geostatistics could serve as a tool to narrow the observed disparity between estimated and mined grades at Ghana Consolidated Diamonds Limited. KNUST 2012-04-03T21:42:18Z 2023-04-19T19:02:23Z 2012-04-03T21:42:18Z 2023-04-19T19:02:23Z 1990 Thesis https://ir.knust.edu.gh/handle/123456789/3394 en 1757 application/pdf
spellingShingle Ashong, Emmanuel Tettey
Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title_full Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title_fullStr Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title_full_unstemmed Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title_short Ore reserve estimation for mine planning at Ghana Consolidated Diamonds Limited, Akwatia
title_sort ore reserve estimation for mine planning at ghana consolidated diamonds limited akwatia
url https://ir.knust.edu.gh/handle/123456789/3394
work_keys_str_mv AT ashongemmanueltettey orereserveestimationformineplanningatghanaconsolidateddiamondslimitedakwatia