The influence of procurement systems on project team performance in Ashanti Region of Ghana

A thesis submitted to the Department of Building Technology in partial fufilment of the requirement of the Master of Science in Procurement Management,

Saved in:
Bibliographic Details
Main Author: Ibrahim, Moro
Format: Thesis
Language:English
Published: 2014
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613138487083008
access_status_str Open Access
author Ibrahim, Moro
author_browse Ibrahim, Moro
author_facet Ibrahim, Moro
author_sort Ibrahim, Moro
collection Thesis
description A thesis submitted to the Department of Building Technology in partial fufilment of the requirement of the Master of Science in Procurement Management,
format Thesis
id oai:ir.knust.edu.gh:123456789/6381
institution KNUST (Ghana)
language English
last_indexed 2026-06-10T12:31:22.621Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2014
publishDateRange 2014
publishDateSort 2014
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/6381 The influence of procurement systems on project team performance in Ashanti Region of Ghana Ibrahim, Moro procurement systems project team project performance indicators A thesis submitted to the Department of Building Technology in partial fufilment of the requirement of the Master of Science in Procurement Management, In recent times clients have increasingly demanded for “better value for money” from their projects in term of cost, quality and time. An attempt by the construction industry to provide better deal to its clients has been through innovative or “fast-tracking” project procurement systems. However, unique project procurement systems present unique methods, processes and procedures of construction of projects for the client. These different systems also prescribe the variation of the organizational structure of the project team in term of role, responsibility and authority. So how do the different procurement systems affect the performance of the project team considering that the method, process, procedure and organization vary according to the systems? The aim of this research was to determine the influence of procurement systems on the performance of project teams in Ashanti Region of Ghana. In order to achieve the aim, two objectives were set which include: determination of critical roles performed by project team under Traditional and Design & Build procurement systems and determination of impact of the two procurement systems on the performance of the identified roles. This research took the form of literature review and survey using questionnaire approach. Responses to the questionnaire sent to project team members (Architects, Quantity Surveyors, Engineers and Land Surveyors) were collected, collated and analyzed. From the literature review and the analysis of the survey results, five findings were made as follows. Firstly, the critical roles of building project team do not vary under Traditional and Design & Build procurement systems. Secondly, the levels of importance attached to the identified key roles vary with the two systems. Thirdly, leadership role with regards to project team members changes under the two procurement systems. Fourthly, the two procurement systems have different levels of effectiveness of performance roles of project team. And lastly, procurement systems influence performance level of construction project team members. Based on these results, it was recommended that key roles and responsibilities of the construction team members (i.e. Architects, Quantity Surveyors Engineers and Surveyors) should be clearly defined under each building procurement systems. Also, in any building project, before selecting a particular procurement system, the performance indicators (in terms of cost, quality and time) should be set. KNUST 2014-08-22T13:49:29Z 2023-04-20T06:58:20Z 2014-08-22T13:49:29Z 2023-04-20T06:58:20Z 2014-08-22 Thesis https://ir.knust.edu.gh/handle/123456789/6381 en application/pdf
spellingShingle procurement systems
project team
project performance indicators
Ibrahim, Moro
The influence of procurement systems on project team performance in Ashanti Region of Ghana
title The influence of procurement systems on project team performance in Ashanti Region of Ghana
title_full The influence of procurement systems on project team performance in Ashanti Region of Ghana
title_fullStr The influence of procurement systems on project team performance in Ashanti Region of Ghana
title_full_unstemmed The influence of procurement systems on project team performance in Ashanti Region of Ghana
title_short The influence of procurement systems on project team performance in Ashanti Region of Ghana
title_sort influence of procurement systems on project team performance in ashanti region of ghana
topic procurement systems
project team
project performance indicators
url https://ir.knust.edu.gh/handle/123456789/6381
work_keys_str_mv AT ibrahimmoro theinfluenceofprocurementsystemsonprojectteamperformanceinashantiregionofghana
AT ibrahimmoro influenceofprocurementsystemsonprojectteamperformanceinashantiregionofghana