Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)

A project report presented in partial fulfillment of the requirements for a degree of Master of Science in Construction Management.

Saved in:
Bibliographic Details
Main Author: Oduro Asamoah, Richard
Format: Thesis
Language:English
Published: 2011
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613138201870336
access_status_str Open Access
author Oduro Asamoah, Richard
author_browse Oduro Asamoah, Richard
author_facet Oduro Asamoah, Richard
author_sort Oduro Asamoah, Richard
collection Thesis
description A project report presented in partial fulfillment of the requirements for a degree of Master of Science in Construction Management.
format Thesis
id oai:ir.knust.edu.gh:123456789/688
institution KNUST (Ghana)
language English
last_indexed 2026-06-10T12:31:22.621Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2011
publishDateRange 2011
publishDateSort 2011
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/688 Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions) Oduro Asamoah, Richard A project report presented in partial fulfillment of the requirements for a degree of Master of Science in Construction Management. Risk management is a major concern to players in the construction industry. Poor management of risk has resulted in delay in completion of projects, and in some cases leading to litigation. Several management strategies have been adopted for managing risk. Amongst such strategies is the use of Contingency Sum in construction projects. This study was to identify existing methods and factors influencing determination, monitoring Contingency Sum and propose guidelines for determining and monitoring Contingency Sum. Random sampling technique (stratified) was used for determining sample size for selected building professionals (Quantity Surveyors, Architects and Civil Engineers), using the Kish formula. 250 questionnaires were administered to professionals in the building industry and 133(53.2%) were returned. Data collected were analysed using the relative important index (4 - most important factor and 1 – least important ranking). Kendall’s co-efficient of concordance was used to measure the degree of agreement among the selected professionals. The study identified that Deterministic approach (percentage method) was the most widely used method. Unexpected ground conditions (substructure works), design consideration and inflation were identified as the most influencing factors. Contingency Sums were mainly monitored by Project Managers. The study concludes by proposing a method for determining contingency sum and suggests the use of a more scientific approach such as Estimating Using Risk Analysis or the Monte Carlo Simulation. Further, an over site body should be established to monitor the management of Contingency Sum. KNUST 2011-08-08T14:35:42Z 2023-04-20T11:44:02Z 2011-08-08T14:35:42Z 2023-04-20T11:44:02Z 2008-08-08 Thesis https://ir.knust.edu.gh/handle/123456789/688 en application/pdf
spellingShingle Oduro Asamoah, Richard
Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title_full Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title_fullStr Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title_full_unstemmed Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title_short Determining and monitoring of project contingency sum for building developments in Ghana. (A case Study in Ashanti and Greater Accra Regions)
title_sort determining and monitoring of project contingency sum for building developments in ghana a case study in ashanti and greater accra regions
url https://ir.knust.edu.gh/handle/123456789/688
work_keys_str_mv AT oduroasamoahrichard determiningandmonitoringofprojectcontingencysumforbuildingdevelopmentsinghanaacasestudyinashantiandgreateraccraregions