Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Thesis submitted to the Department of Civil Engineering, Kwame Nkrumah University of Science and Technology in partial fulfilment of the requirements for the degree of Master of Science,
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2015
|
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613135248031744 |
|---|---|
| access_status_str | Open Access |
| author | Biney, Stephanie A.B. |
| author_browse | Biney, Stephanie A.B. |
| author_facet | Biney, Stephanie A.B. |
| author_sort | Biney, Stephanie A.B. |
| collection | Thesis |
| description | Thesis submitted to the Department of Civil Engineering, Kwame Nkrumah University of Science and Technology in partial fulfilment of the requirements for the degree of Master of Science, |
| format | Thesis |
| id | oai:ir.knust.edu.gh:123456789/7428 |
| institution | KNUST (Ghana) |
| language | English |
| last_indexed | 2026-06-10T12:31:19.760Z |
| license_str | Not specified — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana) |
| publishDate | 2015 |
| publishDateRange | 2015 |
| publishDateSort | 2015 |
| record_format | dspace |
| source_str | KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana) |
| spelling | oai:ir.knust.edu.gh:123456789/7428 Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region Biney, Stephanie A.B. Thesis submitted to the Department of Civil Engineering, Kwame Nkrumah University of Science and Technology in partial fulfilment of the requirements for the degree of Master of Science, The study focused on the evaluation of the AngloGold wastewater treatment plant for the removal of Arsenic and Cyanide located at Sulphide Treatment Plant,(STP). The company's Tailings waste generated and discharged annually is estimated to be about 2,483,815 tons, they constitute about 80% of As and CN. KNUST 2015-08-07T11:51:47Z 2023-04-19T22:23:40Z 2015-08-07T11:51:47Z 2023-04-19T22:23:40Z 2010-07-07 Thesis https://ir.knust.edu.gh/handle/123456789/7428 en application/pdf |
| spellingShingle | Biney, Stephanie A.B. Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title | Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title_full | Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title_fullStr | Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title_full_unstemmed | Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title_short | Performance of evaluattion of AngloGold Wastewater Treatment Plant (PWTP) Obuasi Mine Ashanti Region |
| title_sort | performance of evaluattion of anglogold wastewater treatment plant pwtp obuasi mine ashanti region |
| url | https://ir.knust.edu.gh/handle/123456789/7428 |
| work_keys_str_mv | AT bineystephanieab performanceofevaluattionofanglogoldwastewatertreatmentplantpwtpobuasimineashantiregion |