Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Project selection under multi-period capital rationing

A thesis submitted to the School of Graduate Studies, Kwame Nkrumah of Science and Technology in partial fulfillment of the requirements for the degree of Master of Science in Industrial Mathematics.

Saved in:
Bibliographic Details
Main Author: Peprah, Alex Kwaku
Format: Thesis
Language:English
Published: 2011
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613135786999808
access_status_str Open Access
author Peprah, Alex Kwaku
author_browse Peprah, Alex Kwaku
author_facet Peprah, Alex Kwaku
author_sort Peprah, Alex Kwaku
collection Thesis
description A thesis submitted to the School of Graduate Studies, Kwame Nkrumah of Science and Technology in partial fulfillment of the requirements for the degree of Master of Science in Industrial Mathematics.
format Thesis
id oai:ir.knust.edu.gh:123456789/833
institution KNUST (Ghana)
language English
last_indexed 2026-06-10T12:31:19.760Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
publishDate 2011
publishDateRange 2011
publishDateSort 2011
record_format dspace
source_str KNUSTSpace — Kwame Nkrumah University of Science & Technology (Ghana)
spelling oai:ir.knust.edu.gh:123456789/833 Project selection under multi-period capital rationing Peprah, Alex Kwaku A thesis submitted to the School of Graduate Studies, Kwame Nkrumah of Science and Technology in partial fulfillment of the requirements for the degree of Master of Science in Industrial Mathematics. Due to insufficient funds available for investment, Municipal Assemblies are unable to initiate or implement all their viable projects. The dilemma facing the Municipal Assemblies is that, which of the numerous projects the management should invest under the limited investment capital in order to maximize profit. To solve this project selection problem, data were drawn from sources such as financial statements, monthly and annual reports, daily newspapers and other relevant documents of the Sunyani Municipal Assembly over the period 2001-2006. Financial Ratios, Continuous Probability Analysis, Linear and Integer Programming Models were used to analyze the data. Sensitivity analyses were performed on the project parameters. The Linear Programming Model designed was suitable for solving large scale project selection under multi-period capital rationing problems, and this produces tlje optimal solution quantities (i.e., the project to be initiated), the value of the objective function (i.e., the Net Present Value) and the opportunity cost of the binding constraints. On the other hand, the selection of small scale project problems was found to be solved easily by Integer Programming Models. The Mathematical models such as linear programming and Integer programming were found to be: • Suitable for selecting potential projects and maximizing the returns from the batch of projects selected by the Sunyani Municipal Assembly, • Suitable for carrying out sensitivity analysis on the optimal solution to Linear programming problems to see how sensitive the project selection is to the changes in the parameters of the model.   KNUST 2011-08-11T21:51:47Z 2023-04-20T02:20:19Z 2011-08-11T21:51:47Z 2023-04-20T02:20:19Z 2008 Thesis https://ir.knust.edu.gh/handle/123456789/833 en 4969 application/pdf application/pdf
spellingShingle Peprah, Alex Kwaku
Project selection under multi-period capital rationing
title Project selection under multi-period capital rationing
title_full Project selection under multi-period capital rationing
title_fullStr Project selection under multi-period capital rationing
title_full_unstemmed Project selection under multi-period capital rationing
title_short Project selection under multi-period capital rationing
title_sort project selection under multi period capital rationing
url https://ir.knust.edu.gh/handle/123456789/833
work_keys_str_mv AT peprahalexkwaku projectselectionundermultiperiodcapitalrationing