Political risk management on international construction projects

This research examines the micro -political risks affecting international construction projects in Namibia and whether these risks are effectively managed. A case study research design was used for the study and the findings were that key threat risks identified in this context were repudiation,...

Full description

Saved in:
Bibliographic Details
Main Author: Muchenga, Isaac
Other Authors: Windapo, Abimbola
Format: Thesis
Language:English
Published: Department of Construction Economics and Management 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613312546504705
access_status_str Open Access
author Muchenga, Isaac
author2 Windapo, Abimbola
author_browse Muchenga, Isaac
Windapo, Abimbola
author_facet Windapo, Abimbola
Muchenga, Isaac
author_sort Muchenga, Isaac
collection Thesis
description This research examines the micro -political risks affecting international construction projects in Namibia and whether these risks are effectively managed. A case study research design was used for the study and the findings were that key threat risks identified in this context were repudiation, contract problems, labour unrest, hostile press, delay in permit approvals while local ownership requirements and expatriate labour restrictions are both threat and opportunity risks . It further emerged that qualitative (heuristic) techniques were commonly used in an ad hoc fashion for risk assessment and that the risk management strategy of cooperation was the most preferred. In addition, evidence suggest s that the execution phase is most prone to micro political risk. A significant number of the micro -political risks identified arise from the host government, while the balance arise from the host society. These findings are likely to apply to other international construction projects in Namibia and have serious implication s for the role of government in the success or failure of infrastructural projects which are badly needed for national development. Therefore, the Namibian Government can positively contribute through introduction of regulations, laws or amendments to laws that enhance opportunities, minimise downside risk, and thereby reduce overall construction costs on international construction projects in the country. It is recommended that systematic risk management in which both qualitative and quantitative techniques are used for risk assessment, be adopted in dealing with micro political risks associated with international construction projects in Namibia. Additionally, tertiary institutions offering risk management training need to focus on qualitative methods to facilitate maximum benefit when these methods are applied by their graduates. The existence of both threat s and opportunities in the micro -political risk environment in international construction means contractors in international construction need to be on the lookout for downside risks as well as opportunities.
format Thesis
id oai:open.uct.ac.za:11427/20676
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:34:08.683Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher Department of Construction Economics and Management
publisherStr Department of Construction Economics and Management
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/20676 Political risk management on international construction projects Muchenga, Isaac Windapo, Abimbola Project Management This research examines the micro -political risks affecting international construction projects in Namibia and whether these risks are effectively managed. A case study research design was used for the study and the findings were that key threat risks identified in this context were repudiation, contract problems, labour unrest, hostile press, delay in permit approvals while local ownership requirements and expatriate labour restrictions are both threat and opportunity risks . It further emerged that qualitative (heuristic) techniques were commonly used in an ad hoc fashion for risk assessment and that the risk management strategy of cooperation was the most preferred. In addition, evidence suggest s that the execution phase is most prone to micro political risk. A significant number of the micro -political risks identified arise from the host government, while the balance arise from the host society. These findings are likely to apply to other international construction projects in Namibia and have serious implication s for the role of government in the success or failure of infrastructural projects which are badly needed for national development. Therefore, the Namibian Government can positively contribute through introduction of regulations, laws or amendments to laws that enhance opportunities, minimise downside risk, and thereby reduce overall construction costs on international construction projects in the country. It is recommended that systematic risk management in which both qualitative and quantitative techniques are used for risk assessment, be adopted in dealing with micro political risks associated with international construction projects in Namibia. Additionally, tertiary institutions offering risk management training need to focus on qualitative methods to facilitate maximum benefit when these methods are applied by their graduates. The existence of both threat s and opportunities in the micro -political risk environment in international construction means contractors in international construction need to be on the lookout for downside risks as well as opportunities. 2016-07-25T11:24:06Z 2016-07-25T11:24:06Z 2016 Master Thesis Masters MSc http://hdl.handle.net/11427/20676 eng application/pdf Department of Construction Economics and Management Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Project Management
Muchenga, Isaac
Political risk management on international construction projects
thesis_degree_str Master's
title Political risk management on international construction projects
title_full Political risk management on international construction projects
title_fullStr Political risk management on international construction projects
title_full_unstemmed Political risk management on international construction projects
title_short Political risk management on international construction projects
title_sort political risk management on international construction projects
topic Project Management
url http://hdl.handle.net/11427/20676
work_keys_str_mv AT muchengaisaac politicalriskmanagementoninternationalconstructionprojects