Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project

Bibliography: p. 103-107.

Saved in:
Bibliographic Details
Main Author: Laros, Marlene Therese
Format: Thesis
Language:English
Published: Department of Environmental and Geographical Science 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613246799740928
access_status_str Open Access
author Laros, Marlene Therese
author_browse Laros, Marlene Therese
author_facet Laros, Marlene Therese
author_sort Laros, Marlene Therese
collection Thesis
description Bibliography: p. 103-107.
format Thesis
id oai:open.uct.ac.za:11427/21620
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:33:05.164Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher Department of Environmental and Geographical Science
publisherStr Department of Environmental and Geographical Science
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/21620 A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project Laros, Marlene Therese Environmental and Geographical Science Bibliography: p. 103-107. Contract No. LHDA (Lesotho Highlands Development Authority) 1000 is the design and construction of the supporting infrastructure for the Mohale Dam, Phase lB of the Lesotho Highlands Water Project (LHWP). The Environmental Evaluation Unit (EEU) of the University of Cape Town (UCT) was employed by GBJV (Gibbs-Bergman Joint Venture), consulting engineers, to conduct the environmental impact assessments for contract No. LHDA 1000. The impact assessments were: * an initial EIA of the Maseru bypass alternatives; * an EIA of two site access roads at the Mohale Dam construction site; * an EIA of the Resident Engineers Camp, and * an EIA of the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR) for the transport of construction materials to the Mohale Dam site. The WAR, which forms part of the existing Mountain Road, was identified as a viable option for the transport of construction materials to the Mohale Dam site. The LCAR was identified from eight alternatives, excluding the WAR, in an initial desk-top study, as a viable route. The WAR proposal involves the upgrading part of existing Mountain Road, which runs in an easterly direction from Maseru, over the Thaba-Putsoa Mountain Range to ThabaTseka. The WAR proposal would upgrade 60 km of this presently degraded road between St. Michael's and Patiseng. The LCAR runs from Maputsoe to Ha Mateka via Teyateyaneng along existing roads. 55 km of new road will be built through the Jorodane Valley from_ Ha Mateka to Mafotholeng (refer to Map 1). Two separate baseline EIA reports were produced for the LCAR and the WAR proposals. 2016-09-01T07:10:54Z 2016-09-01T07:10:54Z 1993 Master Thesis Masters MPhil http://hdl.handle.net/11427/21620 eng application/pdf Department of Environmental and Geographical Science Faculty of Science University of Cape Town
spellingShingle Environmental and Geographical Science
Laros, Marlene Therese
A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
thesis_degree_str Master's
title A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
title_full A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
title_fullStr A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
title_full_unstemmed A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
title_short A comparative evaluation of two alternative access routes, the Least Cost Alternative Route (LCAR) and the Western Access Route (WAR), for the Mohale Dam construction, phase 1B, the Lesotho Highlands Water Project
title_sort comparative evaluation of two alternative access routes the least cost alternative route lcar and the western access route war for the mohale dam construction phase 1b the lesotho highlands water project
topic Environmental and Geographical Science
url http://hdl.handle.net/11427/21620
work_keys_str_mv AT larosmarlenetherese acomparativeevaluationoftwoalternativeaccessroutestheleastcostalternativeroutelcarandthewesternaccessroutewarforthemohaledamconstructionphase1bthelesothohighlandswaterproject
AT larosmarlenetherese comparativeevaluationoftwoalternativeaccessroutestheleastcostalternativeroutelcarandthewesternaccessroutewarforthemohaledamconstructionphase1bthelesothohighlandswaterproject