Study and implementation of load monitoring on an 11 kV underground cable distribution network

Operating and Planning staff of an electricitY supply utility have expressed the opinion that a load monitoring system needed to be installed at protected substations forming part of an 11 kV underground cable reticulation network. Load information was currently only available from feeders conne...

Full description

Saved in:
Bibliographic Details
Main Author: Hampton, Brent Gary
Other Authors: Reineck, K M
Format: Thesis
Language:English
Published: Department of Electrical Engineering 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867614124903497728
access_status_str Open Access
author Hampton, Brent Gary
author2 Reineck, K M
author_browse Hampton, Brent Gary
Reineck, K M
author_facet Reineck, K M
Hampton, Brent Gary
author_sort Hampton, Brent Gary
collection Thesis
description Operating and Planning staff of an electricitY supply utility have expressed the opinion that a load monitoring system needed to be installed at protected substations forming part of an 11 kV underground cable reticulation network. Load information was currently only available from feeders connected to the 132/11 kV stepdown substations which provide infeeds to the system. The staff felt that the availability of feeder load information from the protected substation level of the 11 kV ring network would assist in more efficient system planning and more accurate system operation. This request for additional load data constituted the main motivation for the project described in this report. The two main objectives of the project can thus be stated as follows: (i) To prove conclusively that there were benefits to be derived from implementing load monitoring at protected susbstations on the 11 kV reticulation network. (ii) To implement a suitable load monitoring system if the study resulting from (i) proved this was necessary.
format Thesis
id oai:open.uct.ac.za:11427/21865
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:47:03.878Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher Department of Electrical Engineering
publisherStr Department of Electrical Engineering
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/21865 Study and implementation of load monitoring on an 11 kV underground cable distribution network Hampton, Brent Gary Reineck, K M Electrical Engineering Operating and Planning staff of an electricitY supply utility have expressed the opinion that a load monitoring system needed to be installed at protected substations forming part of an 11 kV underground cable reticulation network. Load information was currently only available from feeders connected to the 132/11 kV stepdown substations which provide infeeds to the system. The staff felt that the availability of feeder load information from the protected substation level of the 11 kV ring network would assist in more efficient system planning and more accurate system operation. This request for additional load data constituted the main motivation for the project described in this report. The two main objectives of the project can thus be stated as follows: (i) To prove conclusively that there were benefits to be derived from implementing load monitoring at protected susbstations on the 11 kV reticulation network. (ii) To implement a suitable load monitoring system if the study resulting from (i) proved this was necessary. 2016-09-25T16:17:09Z 2016-09-25T16:17:09Z 1987 Master Thesis Masters MSc (Eng) http://hdl.handle.net/11427/21865 eng application/pdf Department of Electrical Engineering Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Electrical Engineering
Hampton, Brent Gary
Study and implementation of load monitoring on an 11 kV underground cable distribution network
thesis_degree_str Master's
title Study and implementation of load monitoring on an 11 kV underground cable distribution network
title_full Study and implementation of load monitoring on an 11 kV underground cable distribution network
title_fullStr Study and implementation of load monitoring on an 11 kV underground cable distribution network
title_full_unstemmed Study and implementation of load monitoring on an 11 kV underground cable distribution network
title_short Study and implementation of load monitoring on an 11 kV underground cable distribution network
title_sort study and implementation of load monitoring on an 11 kv underground cable distribution network
topic Electrical Engineering
url http://hdl.handle.net/11427/21865
work_keys_str_mv AT hamptonbrentgary studyandimplementationofloadmonitoringonan11kvundergroundcabledistributionnetwork