Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway

The purpose of the research was to examine the issues that constrain and facilitate the use of value capture mechanisms by the state in Uganda. Considering that limited research had been undertaken on value capture in Uganda, an exploratory case study approach was used to identify and investigate t...

Full description

Saved in:
Bibliographic Details
Main Author: Mwesigye, Ian Kananura
Other Authors: McGaffin, Robert
Format: Thesis
Language:English
Published: Department of Construction Economics and Management 2017
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613214204755969
access_status_str Open Access
author Mwesigye, Ian Kananura
author2 McGaffin, Robert
author_browse McGaffin, Robert
Mwesigye, Ian Kananura
author_facet McGaffin, Robert
Mwesigye, Ian Kananura
author_sort Mwesigye, Ian Kananura
collection Thesis
description The purpose of the research was to examine the issues that constrain and facilitate the use of value capture mechanisms by the state in Uganda. Considering that limited research had been undertaken on value capture in Uganda, an exploratory case study approach was used to identify and investigate the issues associated with the use of value capture in Uganda. The identified case study was the Kampala-Entebbe Express Highway. The methodology involved collection of data using the survey method and desktop review of relevant documentation. The survey method was conducted using face to face interviews with carefully selected respondents that were knowledgeable in the subject matter of the research. Both qualitative and quantitative data were collected. The qualitative data was analysed using thematic analysis with the assistance of Nvivo, a qualitative data analysis tool while descriptive statistics was used to analyse the quantitative data. The findings of the research showed that value is created from the provision of public transport infrastructure. However, there are issues that may constrain the capture of this created value. These included insufficient valuation of land parcels and registration of land ownership, the existing land tenure system, gaps in the policy and legal framework and insufficient institutional capacity.
format Thesis
id oai:open.uct.ac.za:11427/24290
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:32:34.479Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2017
publishDateRange 2017
publishDateSort 2017
publisher Department of Construction Economics and Management
publisherStr Department of Construction Economics and Management
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/24290 What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway Mwesigye, Ian Kananura McGaffin, Robert Property Studies The purpose of the research was to examine the issues that constrain and facilitate the use of value capture mechanisms by the state in Uganda. Considering that limited research had been undertaken on value capture in Uganda, an exploratory case study approach was used to identify and investigate the issues associated with the use of value capture in Uganda. The identified case study was the Kampala-Entebbe Express Highway. The methodology involved collection of data using the survey method and desktop review of relevant documentation. The survey method was conducted using face to face interviews with carefully selected respondents that were knowledgeable in the subject matter of the research. Both qualitative and quantitative data were collected. The qualitative data was analysed using thematic analysis with the assistance of Nvivo, a qualitative data analysis tool while descriptive statistics was used to analyse the quantitative data. The findings of the research showed that value is created from the provision of public transport infrastructure. However, there are issues that may constrain the capture of this created value. These included insufficient valuation of land parcels and registration of land ownership, the existing land tenure system, gaps in the policy and legal framework and insufficient institutional capacity. 2017-05-16T07:36:20Z 2017-05-16T07:36:20Z 2016 Master Thesis Masters MSc http://hdl.handle.net/11427/24290 eng application/pdf Department of Construction Economics and Management Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Property Studies
Mwesigye, Ian Kananura
What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
thesis_degree_str Master's
title What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
title_full What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
title_fullStr What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
title_full_unstemmed What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
title_short What issues facilitate and constrain the use of value capture mechanisms by the state in Uganda : case study of Kampala-Entebbe Express Highway
title_sort what issues facilitate and constrain the use of value capture mechanisms by the state in uganda case study of kampala entebbe express highway
topic Property Studies
url http://hdl.handle.net/11427/24290
work_keys_str_mv AT mwesigyeiankananura whatissuesfacilitateandconstraintheuseofvaluecapturemechanismsbythestateinugandacasestudyofkampalaentebbeexpresshighway