Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The credit and liquidity crisis of 2007 has triggered a number of inconsistencies in the interest rate market, questioning some of the standard methods and assumptions used to price and hedge interest rate derivatives. It has been shown that using a single risk-free curve (constructed from market in...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English |
| Published: |
Division of Actuarial Science
2017
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| Summary: | The credit and liquidity crisis of 2007 has triggered a number of inconsistencies in the interest rate market, questioning some of the standard methods and assumptions used to price and hedge interest rate derivatives. It has been shown that using a single risk-free curve (constructed from market instruments referencing underlying rates of varying tenors) to forecast and discount cash flows is not theoretically correct. Standard market practice has evolved to a multi-curve approach, using different curves to forecast and discount cash flows. The risk-free discount curve is proxied by the Overnight-Indexed Swap (OIS) curve. In South Africa there is no liquid market for OIS. In this dissertation a method is developed to estimate the ZAR OIS curve. A cointegration relationship between the SAFEX Overnight Rate, and the 3-month JIBAR rate is shown to exist. This relationship is used in a dual bootstrap algorithm, to simultaneously estimate the ZAR OIS curve and 3-month JIBAR tenor curve, while maintaining arbitrage relationships. The tractability of this method is shown, by pricing options written on ZAR OIS. |
|---|