Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa

Processes required for the procurement of construction projects by the public and private sectors must comply with many requirements and incentives, not least of which is usually the requirement to provide value for money. However, large capital works construction projects, particularly those undert...

Full description

Saved in:
Bibliographic Details
Main Author: Wimbush Justin
Other Authors: Shaw Corrinne
Format: Thesis
Language:English
Published: Energy Research Centre 2019
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613226288545792
access_status_str Open Access
author Wimbush Justin
author2 Shaw Corrinne
author_browse Shaw Corrinne
Wimbush Justin
author_facet Shaw Corrinne
Wimbush Justin
author_sort Wimbush Justin
collection Thesis
description Processes required for the procurement of construction projects by the public and private sectors must comply with many requirements and incentives, not least of which is usually the requirement to provide value for money. However, large capital works construction projects, particularly those undertaken by the public sector, have a tendency to over-run both their construction schedules and their budgets. This is amply demonstrated in South Africa by the construction of the Medupi and Kusile coal fired power stations by Eskom, the South African national power utility, which are both running over schedule and are projected to be over budget by 52% and 48% respectively. In contrast, Public Private Partnership contracts between the private sector and the South African government were recently used to construct large, utility scale renewable energy facilities in South Africa, with a total capacity equivalent to that of Medupi power station, on time and on budget. This research study considers the various procurement options in use globally for the construction of capital projects, before looking in detail at the Public Private Partnerships approach for infrastructure procurement, both globally and in the South African context for energy projects. The research study and aims to answer the questions, “What are the key factors that influence the outcome of energy projects procured using public private partnerships in South Africa?” and “What interventions could improve the success rates of projects procured using public private partnership contracts in South Africa?”. A social constructionist epistemology was adopted to guide the research, as the context of the research questions is complex requiring flexible research approaches, able to consider matters such as the perceptions of stakeholders involved in energy projects. The research study makes use of a systematic literature review of international publications, and a survey of individuals working in the South African renewable energy industry. The data was analysed using qualitative content analysis to identify themes, and further coded to identify the factors. The research study aims to contribute to the body of knowledge on the use of the effectiveness of the Public Private Partnerships approach used for the procurement of energy projects in South Africa as there appears to have been little research undertaken in this area to date.
format Thesis
id oai:open.uct.ac.za:11427/29373
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:32:46.693Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2019
publishDateRange 2019
publishDateSort 2019
publisher Energy Research Centre
publisherStr Energy Research Centre
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/29373 Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa Wimbush Justin Shaw Corrinne Collier-Reed Brandon Processes required for the procurement of construction projects by the public and private sectors must comply with many requirements and incentives, not least of which is usually the requirement to provide value for money. However, large capital works construction projects, particularly those undertaken by the public sector, have a tendency to over-run both their construction schedules and their budgets. This is amply demonstrated in South Africa by the construction of the Medupi and Kusile coal fired power stations by Eskom, the South African national power utility, which are both running over schedule and are projected to be over budget by 52% and 48% respectively. In contrast, Public Private Partnership contracts between the private sector and the South African government were recently used to construct large, utility scale renewable energy facilities in South Africa, with a total capacity equivalent to that of Medupi power station, on time and on budget. This research study considers the various procurement options in use globally for the construction of capital projects, before looking in detail at the Public Private Partnerships approach for infrastructure procurement, both globally and in the South African context for energy projects. The research study and aims to answer the questions, “What are the key factors that influence the outcome of energy projects procured using public private partnerships in South Africa?” and “What interventions could improve the success rates of projects procured using public private partnership contracts in South Africa?”. A social constructionist epistemology was adopted to guide the research, as the context of the research questions is complex requiring flexible research approaches, able to consider matters such as the perceptions of stakeholders involved in energy projects. The research study makes use of a systematic literature review of international publications, and a survey of individuals working in the South African renewable energy industry. The data was analysed using qualitative content analysis to identify themes, and further coded to identify the factors. The research study aims to contribute to the body of knowledge on the use of the effectiveness of the Public Private Partnerships approach used for the procurement of energy projects in South Africa as there appears to have been little research undertaken in this area to date. 2019-02-06T12:47:18Z 2019-02-06T12:47:18Z 2018 2019-02-06T08:17:21Z Master Thesis Masters MPhil http://hdl.handle.net/11427/29373 eng application/pdf Energy Research Centre Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Wimbush Justin
Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
thesis_degree_str Master's
title Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
title_full Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
title_fullStr Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
title_full_unstemmed Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
title_short Key factors influencing the outcome of Energy Projects procured using Public Private Partnerships in South Africa
title_sort key factors influencing the outcome of energy projects procured using public private partnerships in south africa
url http://hdl.handle.net/11427/29373
work_keys_str_mv AT wimbushjustin keyfactorsinfluencingtheoutcomeofenergyprojectsprocuredusingpublicprivatepartnershipsinsouthafrica