Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector

The 2018 Draft Integrated Resource Plan (IRP) published by the Department of Energy (DoE) of South Africa informs the government’s electricity demand projections until 2050. They are published under the authority of the Electricity Regulation Act (ERA) of 2006. The Electricity Regulations on New Gen...

Full description

Saved in:
Bibliographic Details
Main Author: Kenny, Fadeelah
Other Authors: Glazewski, Jan
Format: Thesis
Language:English
Published: Department of Electrical Engineering 2020
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613684036009984
access_status_str Open Access
author Kenny, Fadeelah
author2 Glazewski, Jan
author_browse Glazewski, Jan
Kenny, Fadeelah
author_facet Glazewski, Jan
Kenny, Fadeelah
author_sort Kenny, Fadeelah
collection Thesis
description The 2018 Draft Integrated Resource Plan (IRP) published by the Department of Energy (DoE) of South Africa informs the government’s electricity demand projections until 2050. They are published under the authority of the Electricity Regulation Act (ERA) of 2006. The Electricity Regulations on New Generation Capacity of 2009 stems from the ERA. The draft IRP must, however, be seen in the context of previous IRPs, and policy considerations outlined in Chapter 2. The draft IRP 2018 sets out to estimate the generating capacity requirements and allocates how much of each energy technology will be commissioned during the projection window. The rollout of the nuclear component of the IRP has had many challenges since the first original IRP was published in 2010. Apart from varied policy jockeying regarding the various energy sectors in South Africa (SA), court cases and other factors, allegations of corruption and maladministration have caused major delays in the envisaged nuclear rollout. This dissertation identifies the legal measures that Eskom as the licence holder and various government entities need to comply with to successfully roll out the nuclear component of the draft IRP 2018. It will describe the applicable legislation, processes and illustrative court cases. In so doing the work will provide guidance on the steps to follow to ensure that the nuclear rollout complies with the legal and policy framework of SA and gets delivered successfully and efficiently. The latest draft IRP 2018 which was published for public comments in the Government Gazette dramatically revises the forecast for SA’s energy demand downwards from a projection of 525 Terawatt hours (TWh) of power in 2050 to 430 TWh for the most optimistic ‘high’ scenario. This revision is the main reason the new IRP no longer calls for massive new coal plants and has relegated nuclear to specific scenarios instead of the ‘base case’. The carbon budget (IRP6) and carbon budget plus market-linked gas price (IRP7) scenarios commission nuclear capacity of 4200 megawatts (MW) and 5600 MW respectively for the period 2031-2040. IRP 6 and 7 have 6 per cent (6.3GW) and 7 per cent (7.35 GW) nuclear of 105 Gigawatt (GW) of installed capacity respectively, up from the 3 per cent (1830 MW) of Koeberg Nuclear Power Plant (Koeberg NPP). For the period 2041 – 2050, IRPs 6 and 7 have 6 per cent (7.56 GW) and 8 per cent (10.08 GW) nuclear of 126 GW of installed capacity respectively. The dissertation identifies the legal requirements and issues and makes recommendations on the steps to be followed to enable a legally sound nuclear rollout for SA.
format Thesis
id oai:open.uct.ac.za:11427/31651
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:40:03.434Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2020
publishDateRange 2020
publishDateSort 2020
publisher Department of Electrical Engineering
publisherStr Department of Electrical Engineering
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/31651 Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector Kenny, Fadeelah Glazewski, Jan Nuclear Engineering The 2018 Draft Integrated Resource Plan (IRP) published by the Department of Energy (DoE) of South Africa informs the government’s electricity demand projections until 2050. They are published under the authority of the Electricity Regulation Act (ERA) of 2006. The Electricity Regulations on New Generation Capacity of 2009 stems from the ERA. The draft IRP must, however, be seen in the context of previous IRPs, and policy considerations outlined in Chapter 2. The draft IRP 2018 sets out to estimate the generating capacity requirements and allocates how much of each energy technology will be commissioned during the projection window. The rollout of the nuclear component of the IRP has had many challenges since the first original IRP was published in 2010. Apart from varied policy jockeying regarding the various energy sectors in South Africa (SA), court cases and other factors, allegations of corruption and maladministration have caused major delays in the envisaged nuclear rollout. This dissertation identifies the legal measures that Eskom as the licence holder and various government entities need to comply with to successfully roll out the nuclear component of the draft IRP 2018. It will describe the applicable legislation, processes and illustrative court cases. In so doing the work will provide guidance on the steps to follow to ensure that the nuclear rollout complies with the legal and policy framework of SA and gets delivered successfully and efficiently. The latest draft IRP 2018 which was published for public comments in the Government Gazette dramatically revises the forecast for SA’s energy demand downwards from a projection of 525 Terawatt hours (TWh) of power in 2050 to 430 TWh for the most optimistic ‘high’ scenario. This revision is the main reason the new IRP no longer calls for massive new coal plants and has relegated nuclear to specific scenarios instead of the ‘base case’. The carbon budget (IRP6) and carbon budget plus market-linked gas price (IRP7) scenarios commission nuclear capacity of 4200 megawatts (MW) and 5600 MW respectively for the period 2031-2040. IRP 6 and 7 have 6 per cent (6.3GW) and 7 per cent (7.35 GW) nuclear of 105 Gigawatt (GW) of installed capacity respectively, up from the 3 per cent (1830 MW) of Koeberg Nuclear Power Plant (Koeberg NPP). For the period 2041 – 2050, IRPs 6 and 7 have 6 per cent (7.56 GW) and 8 per cent (10.08 GW) nuclear of 126 GW of installed capacity respectively. The dissertation identifies the legal requirements and issues and makes recommendations on the steps to be followed to enable a legally sound nuclear rollout for SA. 2020-04-21T14:03:06Z 2020-04-21T14:03:06Z 2019 2020-04-21T14:01:27Z Master Thesis Masters MSc (Eng) https://hdl.handle.net/11427/31651 eng application/pdf Department of Electrical Engineering Faculty of Engineering and the Built Environment
spellingShingle Nuclear Engineering
Kenny, Fadeelah
Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
thesis_degree_str Master's
title Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
title_full Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
title_fullStr Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
title_full_unstemmed Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
title_short Legal consideratios in developing and implementing the 2018 draft intergrated resources plan (IRP): a case study of the nuclear sector
title_sort legal consideratios in developing and implementing the 2018 draft intergrated resources plan irp a case study of the nuclear sector
topic Nuclear Engineering
url https://hdl.handle.net/11427/31651
work_keys_str_mv AT kennyfadeelah legalconsideratiosindevelopingandimplementingthe2018draftintergratedresourcesplanirpacasestudyofthenuclearsector