Causes and effects of delays in road construction projects in South Africa

Delays in road construction projects in South Africa are a common phenomenon. This study aimed at identifying the causes and effects of such delays that are pertinent to South African conditions. The study used a deductive quantitative research approach that used a structured questionnaire developed...

Full description

Saved in:
Bibliographic Details
Main Author: Vahed, Faheem
Other Authors: Windapo, Abimbola
Format: Thesis
Language:English
Published: Department of Construction Economics and Management 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613323014438912
access_status_str Open Access
author Vahed, Faheem
author2 Windapo, Abimbola
author_browse Vahed, Faheem
Windapo, Abimbola
author_facet Windapo, Abimbola
Vahed, Faheem
author_sort Vahed, Faheem
collection Thesis
description Delays in road construction projects in South Africa are a common phenomenon. This study aimed at identifying the causes and effects of such delays that are pertinent to South African conditions. The study used a deductive quantitative research approach that used a structured questionnaire developed through a comprehensive literature review on the subject under study and through a pilot evaluation by experts. The structured questionnaire was sent to clients, consultants, contractors, and other external stakeholders involved in SANRAL projects. A total of 64 responses to the questionnaire was received. The data received was analysed using the Relative Importance Index (RII), Kruskal-Wallis Test and Chi-square test. The Cronbach's Alpha was used to measure reliability with the lowest alpha value of 0.827 indicating a high degree of reliability. The RII indicated the top five overall causes of delays in South Africa road construction are: unrest by local communities, stoppages of work by construction mafia/ neighbouring communities/ wards, delays due to regulatory approval processes, poor engagement with local community, and lack of acceptance of project by community. The top five effects of delays that emerged from the survey are: time overruns, cost overruns, disputes and claims between contract parties, stress, and negative social impact/ bad reputation. The study further found that the top five delay minimising measures included: early engagement with the community, improved communication with community, improved management of subcontractors, effective strategic planning by contractor, and timeous payments to contractor and consultant. The Kruskal-Wallis Test revealed that there was no statistically significant difference in the views of all project stakeholders on the five main causes of road construction project delays. There was no statistically significant difference in the views of all project stakeholders on the major effects of road construction project delays. The results of the Kruskal-Wallis test revealed that there is a statistically significant difference in the views of all project stakeholders on the delay minimising measures. The study concludes that project delays occur on road construction projects in South Africa with the major contributor being external-related causes. The study proposed the following recommendations: early involvement of the community in the project through the establishment of community liaison meetings and the establishment of a Public Liaison Committee (PLC), improved management and supervision by the contractor on site, improvement of decision making and approval by client, timeous payment to consultant and contractors by the client, and the contractor should employ improved strategic planning techniques.
format Thesis
id oai:open.uct.ac.za:11427/37111
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:34:17.944Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2023
publishDateRange 2023
publishDateSort 2023
publisher Department of Construction Economics and Management
publisherStr Department of Construction Economics and Management
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/37111 Causes and effects of delays in road construction projects in South Africa Vahed, Faheem Windapo, Abimbola Road projects delays effects construction South Africa Delays in road construction projects in South Africa are a common phenomenon. This study aimed at identifying the causes and effects of such delays that are pertinent to South African conditions. The study used a deductive quantitative research approach that used a structured questionnaire developed through a comprehensive literature review on the subject under study and through a pilot evaluation by experts. The structured questionnaire was sent to clients, consultants, contractors, and other external stakeholders involved in SANRAL projects. A total of 64 responses to the questionnaire was received. The data received was analysed using the Relative Importance Index (RII), Kruskal-Wallis Test and Chi-square test. The Cronbach's Alpha was used to measure reliability with the lowest alpha value of 0.827 indicating a high degree of reliability. The RII indicated the top five overall causes of delays in South Africa road construction are: unrest by local communities, stoppages of work by construction mafia/ neighbouring communities/ wards, delays due to regulatory approval processes, poor engagement with local community, and lack of acceptance of project by community. The top five effects of delays that emerged from the survey are: time overruns, cost overruns, disputes and claims between contract parties, stress, and negative social impact/ bad reputation. The study further found that the top five delay minimising measures included: early engagement with the community, improved communication with community, improved management of subcontractors, effective strategic planning by contractor, and timeous payments to contractor and consultant. The Kruskal-Wallis Test revealed that there was no statistically significant difference in the views of all project stakeholders on the five main causes of road construction project delays. There was no statistically significant difference in the views of all project stakeholders on the major effects of road construction project delays. The results of the Kruskal-Wallis test revealed that there is a statistically significant difference in the views of all project stakeholders on the delay minimising measures. The study concludes that project delays occur on road construction projects in South Africa with the major contributor being external-related causes. The study proposed the following recommendations: early involvement of the community in the project through the establishment of community liaison meetings and the establishment of a Public Liaison Committee (PLC), improved management and supervision by the contractor on site, improvement of decision making and approval by client, timeous payment to consultant and contractors by the client, and the contractor should employ improved strategic planning techniques. 2023-03-02T08:21:52Z 2023-03-02T08:21:52Z 2022 2023-02-21T07:25:53Z Master Thesis Masters MSc http://hdl.handle.net/11427/37111 eng application/pdf Department of Construction Economics and Management Faculty of Engineering and the Built Environment
spellingShingle Road projects
delays
effects
construction
South Africa
Vahed, Faheem
Causes and effects of delays in road construction projects in South Africa
thesis_degree_str Master's
title Causes and effects of delays in road construction projects in South Africa
title_full Causes and effects of delays in road construction projects in South Africa
title_fullStr Causes and effects of delays in road construction projects in South Africa
title_full_unstemmed Causes and effects of delays in road construction projects in South Africa
title_short Causes and effects of delays in road construction projects in South Africa
title_sort causes and effects of delays in road construction projects in south africa
topic Road projects
delays
effects
construction
South Africa
url http://hdl.handle.net/11427/37111
work_keys_str_mv AT vahedfaheem causesandeffectsofdelaysinroadconstructionprojectsinsouthafrica