Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
he abnormal load management guideline which is currently being used in South Africa is TRH 11. This guideline is based on provisions developed in the 1970s. Design guidelines and traffic loading have changed since then thereby highlighting the need to develop a new abnormal load management system. T...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Civil Engineering
2024
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|