Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The sharp increase in travel demand at ORTIA In recent years has been translated into frequent parking supply and kerbside pickup/drop-off bay shortages, particularly during peak periods. This often results in long delays and Increased frustration amongst those using these facilities. In an attempt...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English Eng |
| Published: |
Department of Civil Engineering
2024
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613328434528256 |
|---|---|
| access_status_str | Open Access |
| author | Adam, Fatima |
| author2 | Vanderschuren, Marianne |
| author_browse | Adam, Fatima Vanderschuren, Marianne |
| author_facet | Vanderschuren, Marianne Adam, Fatima |
| author_sort | Adam, Fatima |
| collection | Thesis |
| description | The sharp increase in travel demand at ORTIA In recent years has been translated into frequent parking supply and kerbside pickup/drop-off bay shortages, particularly during peak periods. This often results in long delays and Increased frustration amongst those using these facilities. In an attempt to solve the termlnal precinct congestion problems currently experienced at O.R. Tambo International Airport (ORTIA), a need exists to understand parking and kerbside drop.aff/plck-up bay demand, so that Infrastructure Investment corresponds to this demand. In light of this, the objective of this study is twofold, namely: To find a relationship between travel demand created by flight activity and terminal precinct ground traffic generation, specifically terminal frontage road and parking facility demand. This relationship should define: The number of person trips produced and attracted by flight activity; and The mode-split and occupancy of these trips, so as to determine the number of vehicle trips per mode produced and attracted by the flight activity. This will, in tum, provide an indication of the demand for parking and kerbside facilities; and To utilise the established parking and kerbside traffic demand Information to determine the corresponding landslde infrastructure required to satisfy the terminal precinct traffic demand at ORTIA. The Infrastructure requirements of this study speclfically alms to determine: The number of kerbside pick-up and drop.aff bays required by the various modes utilising the frontage roads; and the number of public parking bays required by air travellers and visitors to the terminals. |
| format | Thesis |
| id | oai:open.uct.ac.za:11427/40536 |
| institution | University of Cape Town (South Africa) |
| language | English Eng |
| last_indexed | 2026-06-10T12:34:23.309Z |
| license_str | Not specified — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository |
| publishDate | 2024 |
| publishDateRange | 2024 |
| publishDateSort | 2024 |
| publisher | Department of Civil Engineering |
| publisherStr | Department of Civil Engineering |
| record_format | dspace |
| source_str | UCTD — University of Cape Town Open Access Repository |
| spelling | oai:open.uct.ac.za:11427/40536 Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport Adam, Fatima Vanderschuren, Marianne Engineering The sharp increase in travel demand at ORTIA In recent years has been translated into frequent parking supply and kerbside pickup/drop-off bay shortages, particularly during peak periods. This often results in long delays and Increased frustration amongst those using these facilities. In an attempt to solve the termlnal precinct congestion problems currently experienced at O.R. Tambo International Airport (ORTIA), a need exists to understand parking and kerbside drop.aff/plck-up bay demand, so that Infrastructure Investment corresponds to this demand. In light of this, the objective of this study is twofold, namely: To find a relationship between travel demand created by flight activity and terminal precinct ground traffic generation, specifically terminal frontage road and parking facility demand. This relationship should define: The number of person trips produced and attracted by flight activity; and The mode-split and occupancy of these trips, so as to determine the number of vehicle trips per mode produced and attracted by the flight activity. This will, in tum, provide an indication of the demand for parking and kerbside facilities; and To utilise the established parking and kerbside traffic demand Information to determine the corresponding landslde infrastructure required to satisfy the terminal precinct traffic demand at ORTIA. The Infrastructure requirements of this study speclfically alms to determine: The number of kerbside pick-up and drop.aff bays required by the various modes utilising the frontage roads; and the number of public parking bays required by air travellers and visitors to the terminals. 2024-08-29T12:43:39Z 2024-08-29T12:43:39Z 2008 2024-08-29T12:38:45Z Thesis / Dissertation Masters MSc http://hdl.handle.net/11427/40536 en Eng application/pdf Department of Civil Engineering Faculty of Engineering and the Built Environment University of Cape Town |
| spellingShingle | Engineering Adam, Fatima Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| thesis_degree_str | Master's |
| title | Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| title_full | Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| title_fullStr | Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| title_full_unstemmed | Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| title_short | Quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at O.R. Tambo international airport |
| title_sort | quantification of the effect of air traffic on terminal precinct ground traffic and the corresponding ground traffic effect on kerbside and parking infrastructure requirements at o r tambo international airport |
| topic | Engineering |
| url | http://hdl.handle.net/11427/40536 |
| work_keys_str_mv | AT adamfatima quantificationoftheeffectofairtrafficonterminalprecinctgroundtrafficandthecorrespondinggroundtrafficeffectonkerbsideandparkinginfrastructurerequirementsatortambointernationalairport |