Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Power maximisation in a wind plant (WP) is a necessary and continuous procedure to maintain a cost/benefit ratio required for profit making on the capital investment. Limited land availability with a good wind resource or high land leasing costs imposes close turbine deployments onshore, which incre...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English English |
| Published: |
Department of Electrical Engineering
2025
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|