Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

An analysis of construction related contractual issues (risk, time and claim related) in the context of the construction related contractual obligations of the contractor and the employer in fidic yellow (plant and design-build) general conditions of

Includes abstract. Includes bibliographical references (leaves 157-169).

Saved in:
Bibliographic Details
Main Author: Du Toit, Hendrick Cornelius Benjamin
Other Authors: Christie, Richard
Format: Thesis
Language:English
Published: Department of Private Law 2014
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items: An analysis of construction related contractual issues (risk, time and claim related) in the context of the construction related contractual obligations of the contractor and the employer in fidic yellow (plant and design-build) general conditions of