Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The reform of the electricity distribution industry has resulted in the national regulator authorities moving from Rate of Return (ROR) to Incentive Based Regulation (IBR) quality regulation mechanism. This has influenced the reporting, planning, design, operating and maintenance (O&M) philosophy su...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Electrical Engineering
2014
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|