Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa

Includes bibliographical references.

Saved in:
Bibliographic Details
Main Authors: Gbandi, Vivien, Raji, Racheal, Chaka, Isheunesu, Young, Aaron
Other Authors: Hill, Richard
Format: Thesis
Language:English
Published: Department of Environmental and Geographical Science 2014
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613246651891712
access_status_str Open Access
author Gbandi, Vivien
Raji, Racheal
Chaka, Isheunesu
Young, Aaron
author2 Hill, Richard
author_browse Chaka, Isheunesu
Gbandi, Vivien
Hill, Richard
Raji, Racheal
Young, Aaron
author_facet Hill, Richard
Gbandi, Vivien
Raji, Racheal
Chaka, Isheunesu
Young, Aaron
author_sort Gbandi, Vivien
collection Thesis
description Includes bibliographical references.
format Thesis
id oai:open.uct.ac.za:11427/7469
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:33:05.164Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2014
publishDateRange 2014
publishDateSort 2014
publisher Department of Environmental and Geographical Science
publisherStr Department of Environmental and Geographical Science
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/7469 Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa Gbandi, Vivien Raji, Racheal Chaka, Isheunesu Young, Aaron Hill, Richard Includes bibliographical references. This report is on the Environmental Impact Assessment Rectification Process conducted by Environmental Resource Management (ERM) on behalf of Shell Marketing (Pty.) Ltd. for Shell's fuel storage installations within the province of Gauteng, South Africa. This is a feedback report on a selection of sites in Gauteng assessed by four University of Cape Town students who assisted ERM in the project. South African legislation (Environmental Conservation Act 73 of 1989) requires Environmental Impact Assessments (EIAs) to be carried out before the installation of fuel storage tanks. A number of Shell's fuel storage tanks within South Africa were installed without conducting EIAs in violation of this legislation. The Gauteng Government gave Shell and other such companies a six month amnesty period to conduct EIAs retrospectively for fuel tank installations, terming this activity an EIA Rectification Process. Shell thus was expected to conduct Rectification EIAs within the province. Shell commissioned ERM, an independent consultancy, to conduct the EIA Rectification Process. The EIA Rectification process was conducted under the specification of the Gauteng Department of Agriculture, Conservation and Environment (GDACE). ERM divided the applicable tank locations amongst five teams, with a total of 176 sites in Gauteng. Two teams consisted of four University of Cape Town (UCT) Master of Philosophy students in Environmental Management, who assessed 39 sites, on which this report is mostly based. A list of the 39 sites is provided in appendix H, with examples of actual compiled reports shown in appendices G-J. The site inspections conducted by the UCT Masters students were in strict accordance with the environmental assessment requirements stipulated by GDACE for the EIA Rectification Process. The major findings, based on site environmental assessments of tank installations, are that: * the location of the majority of tanks are not accurately listed in Shell's database; * 44% of tank installations are in a dilapidated condition; * 28% of sites show evidence of product leakage; * 92% of sites do not have any pollution prevention measures; and * 87% of sites were assessed to be in the 'moderate vulnerability' category in terms of groundwater pollution analysis. Based on the findings of the study, a number of recommendations have been made to Shell, these include: * 2014-09-15T07:28:13Z 2014-09-15T07:28:13Z 2007 Master Thesis Masters MPhil http://hdl.handle.net/11427/7469 eng application/pdf Department of Environmental and Geographical Science Faculty of Science University of Cape Town
spellingShingle Gbandi, Vivien
Raji, Racheal
Chaka, Isheunesu
Young, Aaron
Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
thesis_degree_str Master's
title Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
title_full Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
title_fullStr Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
title_full_unstemmed Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
title_short Environmental impact assessment rectification process for Shell fuel storage tanks in Gauteng, South Africa
title_sort environmental impact assessment rectification process for shell fuel storage tanks in gauteng south africa
url http://hdl.handle.net/11427/7469
work_keys_str_mv AT gbandivivien environmentalimpactassessmentrectificationprocessforshellfuelstoragetanksingautengsouthafrica
AT rajiracheal environmentalimpactassessmentrectificationprocessforshellfuelstoragetanksingautengsouthafrica
AT chakaisheunesu environmentalimpactassessmentrectificationprocessforshellfuelstoragetanksingautengsouthafrica
AT youngaaron environmentalimpactassessmentrectificationprocessforshellfuelstoragetanksingautengsouthafrica