Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

An algorithm for job scheduling in 2 - machine flow shop problem

This paper considers the problem of scheduling in flow-shop by Johnson's Algorithm method and Genetic Algorithm method to find an optimal sequence for n jobs machine problem based on minimum elapsed time. In scheduling the two machine flow shop problem F2||∑C1, one has to determine a schedule that...

Full description

Saved in:
Bibliographic Details
Format: Article
Published: 2009
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000njm a2000000a 4500
001 oai:repository.ui.edu.ng:123456789/1765
042 |a dc 
720 |a Odior, A. O.  |e author 
720 |a Oyawale, F. A.  |e author 
260 |c 2009 
520 |a This paper considers the problem of scheduling in flow-shop by Johnson's Algorithm method and Genetic Algorithm method to find an optimal sequence for n jobs machine problem based on minimum elapsed time. In scheduling the two machine flow shop problem F2||∑C1, one has to determine a schedule that minimizes the sum of finishing times of an arbitrary number of jobs that need to be executed on two machines, such that each job must complete processing on machine 1 before starting on machine 2. We propose a heuristic for approximating the solution for the F2||∑C1 problem using a genetic algorithm. 
024 8 |a The Journal of the Nigerian Institution of Production Engineers 11, pp. 157-166 
024 8 |a ui_art_odior_algorithm_2009 
024 8 |a http://ir.library.ui.edu.ng/handle/123456789/1765 
653 |a Scheduling 
653 |a Flow-Shop 
653 |a Genetic Algorithm 
653 |a Optimal Sequence 
245 0 0 |a An algorithm for job scheduling in 2 - machine flow shop problem