Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
In this paper, the problem of optimising cash flow so as to enhance the financial feasibility of a multipart project is considered. The problem has been modelled as a single machine scheduling problem. Several sectors of the Nigerian economy where this problem is encountered are also discussed. A re...
| Format: | Article |
|---|---|
| Published: |
2003
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| LEADER | 00000njm a2000000a 4500 | ||
|---|---|---|---|
| 001 | oai:repository.ui.edu.ng:123456789/1766 | ||
| 042 | |a dc | ||
| 720 | |a Oladokun, V. O. |e author | ||
| 260 | |c 2003 | ||
| 520 | |a In this paper, the problem of optimising cash flow so as to enhance the financial feasibility of a multipart project is considered. The problem has been modelled as a single machine scheduling problem. Several sectors of the Nigerian economy where this problem is encountered are also discussed. A real life problem was solved on a PC using an electronic spreadsheet. | ||
| 024 | 8 | |a 1595-3610 | |
| 024 | 8 | |a The Nigerian Journal of Engineering Management. 4(1), pp. 22-25 | |
| 024 | 8 | |a ui_art_oladokun_optimizing_2003 | |
| 024 | 8 | |a http://ir.library.ui.edu.ng/handle/123456789/1766 | |
| 653 | |a Scheduling. | ||
| 653 | |a Projed financing. | ||
| 653 | |a Cash flow. | ||
| 653 | |a Optimisation. | ||
| 653 | |a Electrons Spreadsheet | ||
| 245 | 0 | 0 | |a Optimizing investments' cash flow: a scheduling approach. |