Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The design and construction of a 5 kW turbine for a proposed micro hydroelectric power plant installation at Awba Dam University of Ibadan was undertaken. Dam outflow rate and the average head of outflow were determined using a topographical survey of the dam and pertinent calculations. For selectio...
| Format: | Article |
|---|---|
| Published: |
2011
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|