Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Design and construction of a 5kW turbine for a proposed micro hydroelectric power plant installation at Awba dam University of Ibadan

The design and construction of a 5 kW turbine for a proposed micro hydroelectric power plant installation at Awba Dam University of Ibadan was undertaken. Dam outflow rate and the average head of outflow were determined using a topographical survey of the dam and pertinent calculations. For selectio...

Full description

Saved in:
Bibliographic Details
Format: Article
Published: 2011
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!