Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Dissertation (MBA)--University of Pretoria, 2008.
| Other Authors: | |
|---|---|
| Format: | Thesis |
| Published: |
University of Pretoria
2013
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613713226268672 |
|---|---|
| access_status_str | Open Access |
| author2 | Tobin, Peter |
| author_browse | Tobin, Peter |
| author_facet | Tobin, Peter |
| collection | Thesis |
| dc_rights_str_mv | © 2008, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria |
| description | Dissertation (MBA)--University of Pretoria, 2008. |
| format | Thesis |
| id | oai:repository.up.ac.za:2263/23174 |
| institution | University of Pretoria (South Africa) |
| last_indexed | 2026-06-10T12:40:31.230Z |
| license_str | Other — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository |
| publishDate | 2013 |
| publishDateRange | 2013 |
| publishDateSort | 2013 |
| publisher | University of Pretoria |
| publisherStr | University of Pretoria |
| record_format | dspace |
| source_str | UPSpace — University of Pretoria Institutional Repository |
| spelling | oai:repository.up.ac.za:2263/23174 Impact and management of project stakeholders in the chemical sector Tobin, Peter upetd@up.ac.za Moodley, Anban UCTD Project management Dissertation (MBA)--University of Pretoria, 2008. This research investigated the impact and management of external project stakeholders in the Chemical sector located in the geographic region of Sasolburg (Free State province of South Africa). Within a context where the relationship between a project and its stakeholders is central to project success, and where stakeholder management is currently marginalised and suppressed, this research aimed to distinguish between which external project stakeholders are more important than others; understand which stakeholders posed a higher risk; and which dimensions required the most development to improve project stakeholder management. The research methodology was approached from a philosophical stance corresponding to a positivism paradigm and utilised deductive reasoning. The research strategy was survey based with a cross-sectional time horizon while the data collection method used non-probability sampling, specifically the snowball sampling technique, and employed questionnaires as a means to elicit the required data for analysis. This research found that the most important external stakeholder groups, and who caused the most problems and uncertainty for the project, were contractors/suppliers; clients; and end users. Due to their high levels of involvement and criticality of roles during the project lifecycle these stakeholders should be the focal point of stakeholder management initiatives. The dimensions of stakeholder management requiring the most development was strategy and plans; evaluations; and tools and methods indicating a need for a tactical approach to stakeholder management. Gordon Institute of Business Science (GIBS) unrestricted 2013-09-06T14:41:55Z 2010-05-31 2013-09-06T14:41:55Z 2009-04-01 2008 2010-03-13 Dissertation Moodley, A 2008, Impact and management of project stakeholders in the chemical sector, MBA dissertation, University of Pretoria, Pretoria, viewed yymmdd < http://hdl.handle.net/2263/23174 > G10/41/ag http://hdl.handle.net/2263/23174 http://upetd.up.ac.za/thesis/available/etd-03132010-175641/ © 2008, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria application/pdf University of Pretoria |
| spellingShingle | UCTD Project management Impact and management of project stakeholders in the chemical sector |
| title | Impact and management of project stakeholders in the chemical sector |
| title_full | Impact and management of project stakeholders in the chemical sector |
| title_fullStr | Impact and management of project stakeholders in the chemical sector |
| title_full_unstemmed | Impact and management of project stakeholders in the chemical sector |
| title_short | Impact and management of project stakeholders in the chemical sector |
| title_sort | impact and management of project stakeholders in the chemical sector |
| topic | UCTD Project management |
| url | http://hdl.handle.net/2263/23174 http://upetd.up.ac.za/thesis/available/etd-03132010-175641/ |